MERC · Maharashtra Electricity Regulatory Commission

Deviation Settlement Mechanism and related matters Regulations, 2018 — Draft

Maharashtra Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2018

Draft regulationReleased with the notice dated 23 Oct 2018

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft MERC principal regulation, issued in October 2018, to create an intra-state deviation settlement mechanism for Maharashtra (p1). It is drafted as a full regulation, not a covering note: the draft notification cites the Electricity Act 2003 and then sets out 21 regulations and two annexures.

The opening regulations give the short title and a split commencement: most provisions start on Gazette notification, but commercial arrangements, deviation charges, additional charges and penal action are deferred to a separate Order no later than 1 April 2020, with the existing FBSM under Case 42 of 2006 continuing in the meantime (p1). Definitions cover buyers, sellers, State entities, deviation, FBSM, full/partial open access consumers, gaming, the State Deviation Pool Account and time-blocks (p1–3). Regulation 3 states the objective as grid discipline and security; Regulation 4 applies the framework to scheduled open access transactions on the intra-state transmission/distribution system, excluding wind and solar (which go to the 2018 forecasting and scheduling regulations) and in-situ captive generators, and routing partial open access and distribution-connected consumers to the 2016 open access regulations (p3–4). Regulation 5 imposes duties on SLDC and State entities, including contracts, grid-code compliance, connection agreements, metering and binding despatch instructions (p4–5).

Regulation 6 is the design core: 15-minute scheduling blocks, merit-order despatch and surplus-power exchange principles, frequency operating range, deviation pooling, weekly settlement, measurement units, CERC-linked price vector, volume limits, losses and a 12-block sign-change discipline (p5–7). Regulations 7–8 cover scheduling and gaming; Regulations 9–11 set deviation charges, caps, zero-charge conditions, volume-limit consequences and infirm/start-up power treatment (p7–12). Regulations 12–16 require SLDC procedures, State Energy Accounts, weekly deviation statements, compliance with SLDC instructions, pool accounting, payment timelines, interest and letters of credit (p12–16). Regulations 17–21 continue the Maharashtra State Power Committee and give the Commission amendment, difficulty-removal, relaxation and direction powers (p16–18). Annexure I contains the frequency-linked deviation price table and inter-state open access adjustment; Annexure II contains the additional-deviation-charge tables (p19–22).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Scheduling and despatch, Energy accounting and settlement

Read with this

Voltaic holds no final regulation made from this draft.

Proposed changes (drafts with no final yet)

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗