BERC · Bihar Electricity Regulatory Commission
Intra-State Open Access Regulations, 2017 — Consultative Paper and Draft
Bihar Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) Regulations, 2017
Draft regulationDated 29 Jan 2018SMP No. 3/2018 dated 29-01-2018
Draft
A proposal that has since been finalised as the Intra-State Open Access Regulations, 2018.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Bihar Electricity Regulatory Commission issued this consultation package to replace its 2005 open access regulations. Page 1 is a public notice (No. 02, Patna, 29-01-2018) recording Suo-Motu Proceeding No. 3/2018, stating that the draft regulations and consultative paper are on the Commission's website and available free at its office, inviting comments to reach the Secretary by 09.03.2018, and announcing a public hearing at 11.00 A.M. on 20.03.2018 (p1).
The consultative paper (pp2-4) reproduces s.42 of the Electricity Act 2003 and explains the Commission's view that the BERC (Terms and Conditions for Open Access) Regulations, 2005 — notified in 2006 — are not self-explanatory and lack clarity on categories of open access, associated nodal agencies, application and approval procedures, applicable charges and losses.
The draft regulations (pp5-42) run to ten chapters and 43 regulations. Chapters 1-3 give definitions, set out connectivity to the intra-State transmission system (consumers and generating stations of 10 MW and above) and to the distribution system (generating stations below 10 MW), and lay down eligibility for open access, including the 1 MW consumer threshold. Chapter 4 is the operational core: categories of open access customers, the application procedure with two large tables fixing nodal agency, fees, documents, disposal timelines, charges and losses, separate procedures for long-term access, medium-term and short-term open access (including advance, day-ahead and bidding routes), consent by STU/SLDC/distribution licensee, and allotment priority.
Chapters 5-8 deal with money and operations: the charge heads (transmission, scheduling and system operation, wheeling, cross subsidy, additional surcharge, standby and other charges), scheduling, metering, revision and loss apportionment, imbalance and reactive energy settlement, and billing, default and payment security. Chapters 9-10 cover SLDC information publication, relinquishment of capacity, capacity-availability computation, curtailment priority, dispute resolution, powers to remove difficulties, repeal and savings, and the power to amend.
Read with this
The regulation
- Dated 13 Jul 2018Intra-State Open Access Regulations, 2018
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.