BERC · Bihar Electricity Regulatory Commission

Intra-State Open Access Regulations, 2018

Terms and Conditions of Intra-State Open Access Regulations, 2018

RegulationDated 13 Jul 2018Published in the Gazette 17 Jul 2018BERC-SMP-03/2018 dated The 13th July, 2018

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software, from pages 1 to 30 of 40. Check the regulator's original before you rely on it.

These are BERC's principal regulations for intra-State open access in Bihar, notified 13 July 2018 and published in the Bihar Gazette on 17 July 2018 (p1). They extend to Bihar and come into force on Gazette publication (p1). Chapter 1 defines terms and interpretation (pp1–3). Chapter 2 creates connectivity routes: consumers and generators of 10 MW and above to the intra-State transmission system, and smaller generating stations to the distribution system, with application, fee, study, agreement and decision timelines (pp3–6). Chapter 3 sets open-access eligibility for generating companies, captive generating plants and consumers at 1 MW and above, with captive own-use exemption and a defaulter exclusion (pp6–7). Chapter 4 is the procedural core: categories of open-access consumers, nodal agencies, application fees/documents/timelines in Tables 1–2, detailed LTOA/MTOA/STOA procedures, consent and deemed consent, summary rejection of defaulters, and allotment priority (pp7–27). Chapter 5 specifies transmission, scheduling/system operation, wheeling, cross-subsidy, additional, standby and other charges, including solar/wind and captive exemptions (pp27–30). Chapter 6 begins scheduling, metering, revision and loss provisions.

Standard name
Open Access Regulations
Primary topics
Open access, Connectivity and GNA, Open access charges

Read with this

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of BERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document