CERC · Central Electricity Regulatory Commission

Terms & Conditions of Tariff Regulations, 2001 — First Amendment, 2001

Gazette – Terms and conditions of Tariff L-25(1)/2001-CERC

RegulationDated 21 Sep 2001Published in the Gazette 24 Sep 2001In force from 29 May 2001L-7/25(l)/2001-CERC dated 21st September, 2001

Replaced by Terms and Conditions of Tariff Regulations, 2004

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page Gazette notification by which CERC made the first amendment to its 2001 Terms & Conditions of Tariff Regulations (p2). It is a short, targeted instrument — three operative clauses, all dealing with transmission projects executed through IPTC/JV routes.

Clause 3 inserts a proviso at the end of clause (d) of Regulation 4.4 in Chapter 4, allowing 1.5% (one and a half percent) of the actual capital cost of such a transmission project as O&M expenses in the first year of operation, escalated in later years under the formula already in clause (d) (p2).

Clause 4 substitutes "Powergrid Corporation of India Limited" for "Transmission Utility" wherever it occurs in Regulation 4.10 (p2).

Clause 5 inserts a new Regulation 4.10A creating a "Transmission Majoration Factor": a 10% (ten percent) pre-tax mark-up on transmission charges for IPTC/JV transmission projects, expressly denied to HVDC projects on those routes, and available for the entire life of the project only to a new investor entering transmission through IPTC/JV routes who was granted a transmission licence under s.27C of the Indian Electricity Act, 1910 up to 31-3-2004 (p2).

Clause 2 makes the amendment retrospective — deemed in force from 29 May 2001 — and caps it at 31 March 2004 unless reviewed earlier or extended (p2). Page 1 is only the Gazette masthead (No. 252, 24 September 2001).

Standard name
Tariff Regulations
Primary topics
Transmission tariff, Tariff determination, Operating costs and other income

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document