CERC · Central Electricity Regulatory Commission
Terms & Conditions of Tariff Regulations, 2001 — First Amendment, 2001
Gazette – Terms and conditions of Tariff L-25(1)/2001-CERC
RegulationDated 21 Sep 2001Published in the Gazette 24 Sep 2001In force from 29 May 2001L-7/25(l)/2001-CERC dated 21st September, 2001
Replaced by Terms and Conditions of Tariff Regulations, 2004
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a two-page Gazette notification by which CERC made the first amendment to its 2001 Terms & Conditions of Tariff Regulations (p2). It is a short, targeted instrument — three operative clauses, all dealing with transmission projects executed through IPTC/JV routes.
Clause 3 inserts a proviso at the end of clause (d) of Regulation 4.4 in Chapter 4, allowing 1.5% (one and a half percent) of the actual capital cost of such a transmission project as O&M expenses in the first year of operation, escalated in later years under the formula already in clause (d) (p2).
Clause 4 substitutes "Powergrid Corporation of India Limited" for "Transmission Utility" wherever it occurs in Regulation 4.10 (p2).
Clause 5 inserts a new Regulation 4.10A creating a "Transmission Majoration Factor": a 10% (ten percent) pre-tax mark-up on transmission charges for IPTC/JV transmission projects, expressly denied to HVDC projects on those routes, and available for the entire life of the project only to a new investor entering transmission through IPTC/JV routes who was granted a transmission licence under s.27C of the Indian Electricity Act, 1910 up to 31-3-2004 (p2).
Clause 2 makes the amendment retrospective — deemed in force from 29 May 2001 — and caps it at 31 March 2004 unless reviewed earlier or extended (p2). Page 1 is only the Gazette masthead (No. 252, 24 September 2001).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.