RegulationDated 26 Mar 2004In force from 1 Apr 2004No. L-7/25(5)/2003-CERC dated 26th March 2004

Replaced by Terms and Conditions of Tariff Regulations, 2009

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 35 of 61. Check the regulator's original before you rely on it.

Notification No. L-7/25(5)/2003-CERC dated 26 March 2004 makes the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2004 under Section 178 of the Electricity Act, 2003 (p1). They come into force on 1.4.2004 and, unless reviewed earlier or extended, run for five years (p1). Chapter 1 is preliminary: it says CERC will adopt tariffs set through Central Government bidding guidelines but will determine capital-cost-based tariffs in other cases; it treats the norms as ceiling norms that may be improved by agreement and sets out tariff application stages, treatment of core-business income-tax and foreign-exchange variation, tax escrow, deviation from norms, and powers to relax or remove difficulties (p1–5). It preserves the Net Fixed Assets approach for Neyveli Lignite TPS-I and TPS-II (p5).

Chapter 2 governs thermal generating stations (p6–29). It defines technical and financial terms (p6–9), splits tariff into annual capacity/fixed charges and energy/variable charges (p9), and sets ceiling norms for target availability and PLF, gross station heat rate, secondary fuel oil consumption, auxiliary energy consumption and stabilization-period relaxation, with station-specific exceptions (p9–14). It then deals with capital cost and additional capitalisation, infirm power revenue, the 70:30 debt-equity ratio, and the computation of capacity charges — interest on loan, depreciation/advance against depreciation, return on equity, O&M expenses and interest on working capital (p14–22). Energy charges are formula-based on fuel cost, with monthly fuel-price/GCV adjustment and normative landed-coal losses (p22–23). The chapter also covers incentive, UI charges linked to grid frequency, rebate, late payment surcharge, scheduling by RLDCs under the Indian Electricity Grid Code, penalties for mis-declaration, metering/accounting and monthly billing formulas (p23–29).

Chapter 3 starts the hydro power generating station regime (p30–35). It defines hydro-specific terms such as capacity index, design energy, primary/secondary energy and saleable energy after 12% free energy to the home state, and sets norms for capacity index, auxiliary consumption and transformation losses, followed by capital-cost and additional-capitalisation rules (p30–35). Appendices I and II (application format and depreciation rates) are referenced but not included (p2, p17).

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Capital cost and investment

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document