CERC · Central Electricity Regulatory Commission
REC Regulations, 2010 — Notification
REC Regulations, 2010 - Notification
RegulationDated 29 Jan 2010No.1/1/2009-Reg.Aff. (REC)/CERC dated 29th January, 2010
Replaced by Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page CERC notification that designates an institution rather than laying down substantive rules. Acting under Regulation 3(1) of the Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010, the Central Commission designates the National Load Despatch Centre (NLDC) — established under Section 26(1) of the Electricity Act, 2003 — as the Central Agency for the purposes of those REC Regulations (p1). The notification is dated 29 January 2010 and signed by the Secretary, Alok Kumar (p1). It contains no operative detail beyond the designation: no functions, fees, procedures, eligibility conditions or transitional provisions are set out here, and the reader must go to the REC Regulations 2010 themselves for what the Central Agency does. Its significance is purely institutional — it fixes who administers the REC framework — and it is relevant to anyone tracking the original establishment of the REC mechanism.
Read with this
Other copies of these documents (1)
- Dated 29 Jan 2010REC Regulations, 2010 — Gazette
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.