Skip to content

CERC · Central Electricity Regulatory Commission

Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022

Central Electricity Regulatory Commission (Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation) Regulations, 2022

RegulationDated 9 May 2022No. RA-14026(11)/1/2022-CERC

1 amendment to it is on Voltaic, dated 24 Mar 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission's REC Regulations, 2022 (notification dated 9 May 2022, p1) replace the 2010 REC framework and lay down how renewable energy certificates are accredited, registered, issued, traded and redeemed. They do not commence on their own: regulation 1(2) leaves the commencement date to a separate notification in the Official Gazette, and that date is not printed here (p1).

Regulations 2–3 (p1–4) define the working vocabulary — eligible entity, obligated entity, Central Agency, State Agency, Certificate Multiplier, Detailed Procedure — and make the National Load Despatch Centre the Central Agency, with power for the Commission to designate another agency (p4).

Regulations 4–9 (p4–7) set who may obtain certificates and how. Eligibility covers renewable energy generating stations, renewable-based captive plants, distribution licensees and open access consumers, subject to conditions on tariff determination and on availing transmission or wheeling waivers; certificates for captive self-consumption cannot be sold. Accreditation is split between State Agencies (intra-State entities) and RLDCs (inter-State entities), registration sits with the Central Agency, both can be revoked for breach, and entities must report changes of name or legal status.

Regulations 10–14 (p7–12) govern the certificate lifecycle: application windows and issuance timelines, exchange through power exchanges or electricity traders and redemption on RPO compliance, denomination with a technology-wise Certificate Multiplier and rules on its assignment and validity, price discovery on exchanges or by mutual agreement, and validity of certificates until redeemed.

Regulations 15–19 (p12–14) cover fees, the Detailed Procedure the Central Agency must issue, the Commission's powers to give directions and to relax provisions, and repeal of the 2010 regulations with detailed savings. Appendix-1 (p15) sets the principles for determining the multiplier.

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC), Renewable purchase obligation (RPO / RCO), Power markets and exchanges

Read with this

Other copies of these documents (2)

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document