GERC · Gujarat Electricity Regulatory Commission
Standards of Performance of Distribution Licensees, 2023 — First Amendment, 2026 — Draft
Gujarat Electricity Regulatory Commission (Standards of Performance of Distribution Licensees) (First Amendment) Regulations, 2026
Draft amendmentDated 17 Oct 2026
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft first amendment by the Gujarat Electricity Regulatory Commission to its 2023 Standards of Performance of Distribution Licensees Regulations. It is made under the Electricity Act, 2003 and the Gujarat Electricity Industry (Reorganisation and Regulation) Act, 2003, applies to all distribution licensees in Gujarat, and comes into force from Gazette publication (p1).
Paragraph 2 amends the definitions chapter: a new definition of the Customer Average Interruption Frequency Index (CAIFI) is inserted, a definition of "Metropolitan area" (based on a population threshold, to be notified by the Government) is inserted, and the definition of the Momentary Average Interruption Frequency Index (MAIFI) is replaced (pp1–2).
Paragraph 3 replaces Regulation 4.2, which sets the standard times for energising new connections, load enhancement, connections shifted to new premises and connections after conversion of service. The limits differ between Metropolitan, Urban (other than Metropolitan) and Rural areas, and are longer where network modification — new distribution transformer, new or augmented HT line, or EHT line and/or sub-station — is required; the licensee must tell the applicant the likely time of energisation (pp2–3).
Paragraph 4 rewrites the reliability chapter. Regulation 5.1 is replaced so that reliability is computed using indices prescribed by IEEE Standard 1366-2022 (SAIFI, SAIDI, CAIDI, MAIFI, CAIFI), with scheduled outages, grid failures and outages falling under Clause 8.4 excluded from the calculation; a CAIFI formula is inserted into Regulation 5.2; Regulations 5.5 and 5.8 are replaced to tie construction, operation and maintenance, and earthing testing and record-keeping, to the CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 (pp3–5).
Paragraph 5 substitutes a row of the Regulation 6.2 compensation table covering delay in energising connections where no network work is needed, including how the default period is counted and how compensation is paid (p5). Paragraph 6 adds a new Appendix-D performa, SoP 013-A, for quarterly and annual CAIFI reporting (pp5–6).
Read with this
The regulation
Commencement notices and reasons
Proposed changes (drafts with no final yet)
- Dated 17 Oct 2026Explanatory memorandum: Standards of Performance of Distribution Licensees, 2023 — First Amendment, 2026 — Explanatory Memorandum — Draft
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.