Statement of Reasons — Standard of Performance of Distribution Licensee Regulations, 2023

Statement of Reasons – GERC (Standard of Performance of Distribution Licensee) Regulations, 2023

Statement of reasonsDated 5 Dec 2023

The commission's reasons for the Standards of Performance of Distribution Licensees Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's Statement of Reasons for the GERC (Standard of Performance of Distribution Licensee) Regulations, 2023, signed at Gandhinagar on 05/12/2023 (p37). It explains why the standards first fixed in 2005 were revised and how the Commission dealt with comments on its 2022 draft.

The background (pp1–2) sets out the driver: the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020 (notified 31.12.2020, amended 28.06.2021) and a Ministry letter of 18.01.2021 asking State regulators to align. The draft 2022 Regulations were publicised on 21.02.2022 in two Gujarati papers and one English paper, comments were due 25.03.2022, and a public hearing was held on 04/05/2022 (pp1–2).

The bulk of the document (pp2–37) is a clause-by-clause record: for each objection the draft clause is quoted, stakeholder comments are summarised, the Commission's reasoning is given, and where a change was accepted the modified final clause text is reproduced. Items cover applicability to consumers (p3), definitions of MAIFI and rural area (pp3–5), complaint registration including electrical safety (p5), grievance redressal meetings (pp5–6), demand notes and energisation timelines by type of network work (pp6–13), temporary supply, shifting and transfer of connections (pp10–14), billing complaints and meter testing/replacement (pp14–16), reconnection (pp17–19), the two-interruptions-a-day limit and fault-wise restoration times (pp19–23), scheduled outages and voltage bands (pp23–24), reliability-index data capture and DT metering (pp25–26), the automatic compensation framework and consumer eligibility conditions (pp26–29), the compensation table with its exclusions (pp29–35), and force majeure relaxation (pp36–37).

A short miscellaneous section (p37) declines to set penalties under other Acts and points to Chapter VII of the Regulations for reporting. Annexures 1 and 2 (p38) list the entities that filed comments and those that attended the hearing.

Standard name
Standards of Performance
Primary topics
Standards of performance, New connections and load changes, Billing and payment

Read with this

Read with this: Standards of Performance of Distribution Licensees Regulations, 2023

One more document belongs here and is not on Voltaic: a copy in another language.

It is also read with

The commission's reasons for a regulation Voltaic does not hold or one of its amendments.

Voltaic does not hold the regulation itself.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document