GERC · Gujarat Electricity Regulatory Commission
Statement of Reasons — Standard of Performance of Distribution Licensee Regulations, 2023
Statement of Reasons – GERC (Standard of Performance of Distribution Licensee) Regulations, 2023
Statement of reasonsDated 5 Dec 2023
The commission's reasons for the Standards of Performance of Distribution Licensees Regulations, 2023.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Gujarat Electricity Regulatory Commission's Statement of Reasons for the GERC (Standard of Performance of Distribution Licensee) Regulations, 2023, signed at Gandhinagar on 05/12/2023 (p37). It explains why the standards first fixed in 2005 were revised and how the Commission dealt with comments on its 2022 draft.
The background (pp1–2) sets out the driver: the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020 (notified 31.12.2020, amended 28.06.2021) and a Ministry letter of 18.01.2021 asking State regulators to align. The draft 2022 Regulations were publicised on 21.02.2022 in two Gujarati papers and one English paper, comments were due 25.03.2022, and a public hearing was held on 04/05/2022 (pp1–2).
The bulk of the document (pp2–37) is a clause-by-clause record: for each objection the draft clause is quoted, stakeholder comments are summarised, the Commission's reasoning is given, and where a change was accepted the modified final clause text is reproduced. Items cover applicability to consumers (p3), definitions of MAIFI and rural area (pp3–5), complaint registration including electrical safety (p5), grievance redressal meetings (pp5–6), demand notes and energisation timelines by type of network work (pp6–13), temporary supply, shifting and transfer of connections (pp10–14), billing complaints and meter testing/replacement (pp14–16), reconnection (pp17–19), the two-interruptions-a-day limit and fault-wise restoration times (pp19–23), scheduled outages and voltage bands (pp23–24), reliability-index data capture and DT metering (pp25–26), the automatic compensation framework and consumer eligibility conditions (pp26–29), the compensation table with its exclusions (pp29–35), and force majeure relaxation (pp36–37).
A short miscellaneous section (p37) declines to set penalties under other Acts and points to Chapter VII of the Regulations for reporting. Annexures 1 and 2 (p38) list the entities that filed comments and those that attended the hearing.
Read with this
Read with this: Standards of Performance of Distribution Licensees Regulations, 2023
The regulation
Proposed changes (drafts with no final yet)
- Dated 17 Oct 2026Standards of Performance of Distribution Licensees, 2023 — First Amendment, 2026 — Draft
- Dated 17 Oct 2026Explanatory memorandum: Standards of Performance of Distribution Licensees, 2023 — First Amendment, 2026 — Explanatory Memorandum — Draft
One more document belongs here and is not on Voltaic: a copy in another language.
It is also read with
The commission's reasons for a regulation Voltaic does not hold or one of its amendments.
Voltaic does not hold the regulation itself.
Amendments and corrections
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.