CERC · Central Electricity Regulatory Commission
Sharing of ISTS Charges and Losses Regulations, 2010
RegulationDated 15 Jun 2010Published in the Gazette 16 Jun 2010III/4/150/10
Replaced by Sharing of Inter-State Transmission Charges and Losses Regulations, 2020
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software, from pages 1 to 31 of 91. Check the regulator's original before you rely on it.
This is a principal electricity regulation published in the Gazette of India, Extraordinary, Part III, Section 4, as issue No. 162, New Delhi, dated 16 June 2010, with the instrument itself shown as dated 15 June 2010 (p1). The catalogue attributes it to CERC.
It is made under the Electricity Act, 2003 and cites section 178 among its enabling provisions (p1). The commencement clause puts it in force on 1 January 2011, roughly six months after publication (p1).
Chapter 1 (pp1–5) carries the short title, commencement and a long glossary of definitions. Chapter 2 (pp5–6) and Chapter 3 (pp6–8) set out initial procedural and application/eligibility provisions. Chapter 4 (pp8–17) holds the main operative framework, including thresholds expressed by voltage — 400 kV and 765 kV recur (p10) — together with percentage and MW-based limits. The chapters from p17 onwards prescribe further methodology and computation, including bracketed formulae with a 1.25 multiplier and 20% factors (pp20–21), record-keeping and notice provisions with time limits (pp26–28), and rules for identifying which clause applies (p27).
Chapter 9 (p29) is the miscellaneous chapter and contains a repeal/savings provision referring back to a regulation of 2009 and to clause 16(1)–(2) of a regulation of 2008 (p29). A Secretary's signature and file number III/4/150/10 close the notification (p30), and an appendix starting at p31 sets out draft formats and guidelines with bracketed placeholders. Formulae and template blocks at pp19–21 and p31 are formats, not obligations. Treat identity and detail as provisional.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.