Skip to content

CERC · Central Electricity Regulatory Commission

Sharing of Inter-State Transmission Charges and Losses Regulations, 2020

Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020

RegulationDated 4 May 2020No.L-1/250/2019/CERC

4 amendments to it are on Voltaic, the latest dated 26 Jun 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's principal regulation for how inter-State transmission system (ISTS) charges and losses are shared among users, replacing the 2010 sharing regulations. Chapter 1 (p1–6) gives the title, applies the regulation to Designated ISTS Customers (DICs), inter-State transmission licensees, NLDC, RLDCs, SLDCs and RPCs, says commencement is by a date to be separately notified, and defines key terms. Chapter 2 (p6–15) splits ISTS charges into National, Regional, Transformer and AC System components, specifies the allocation keys for each, and lays out the AC-UBC computation through Base Case, load flow, Surge Impedance Loading and Hybrid Methodology. It also sets weekly all-India transmission loss computation and scheduling treatment, the Short Term Open Access rate mechanism, and Transmission Deviation computation and recovery.

Chapter 3 (p15–20) handles specific cases, including solar/wind transmission waivers tied to commissioning windows and competitive bidding (including the 1.7.2011–30.6.2017 solar window), delayed COD of generators or associated transmission systems, dedicated lines, start-up power, and part-ISTS connection. Chapter 4 (p21–28) covers accounting, billing, due date, rebate, late payment surcharge, letter of credit/payment security, collection and disbursement, non-payment consequences, and a transition period of two billing periods under the 2010 regulations. Chapter 5 (p28–31) requires procedures and formats within 90 days and public disclosure of data by the Implementing Agency. Chapter 6 (p31–32) repeals the 2010 regulations with savings and gives power to relax and remove difficulties. Annexure-I (p33–45) details the Hybrid Methodology; Annexure-II (p46) gives SIL values used for utilisation determination.

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Losses and loss reduction, Open access charges

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document