CERC · Central Electricity Regulatory Commission
Transmission Licence (Procedure, Terms and Conditions) Regulations, 2023 — Draft
Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations, 2023
Draft regulationDated 28 Nov 2023No. L-1/270/2023/CERC dated 28.11.2023
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The draft notification publishes the full text of the Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations, 2023. It is made under the Electricity Act, 2003 and will commence on publication in the official gazette (p1). Chapter I sets the short title and commencement and defines key actors and instruments — Act, applicant, bid process coordinator, bulk consumer, CTU, deemed licensee, Designated ISTS Customer, GNA Regulations, LTTC, project and transmission plan (pp1–4). Chapter II deals with grant of licence. It lists who is eligible: entities selected through competitive bidding, entities nominated by the Central Government or its agency under the regulated tariff mechanism, and bulk consumers with load of 50 MW and above constructing a connecting line for self-consumption; a bulk consumer may instead have an existing licensee build the line (p5). It then sets the application and consultation process, using Form I, e-filing, service on DICs and CTU, website and newspaper notices in Form II, defect rectification, public objections, CTU recommendations, the Commission's own proposal notice, hearing and issue of licence in Form III or rejection (pp5–8). Chapter III addresses transmission charges: adoption under Section 63 for competitively bid projects, determination under the Section 61 tariff framework otherwise, and cost responsibility for a bulk consumer's connecting line (p8). Chapter IV lays down licence conditions: insurance, time-bound and prudent construction and operation, compliance with NLDC and RLDC directions, open access under the GNA Regulations, licence fee, prior approvals, separate accounts, inspection, information and prudential reporting, amendment and revocation of licence, lender assignment on default, and the licence term and extension arrangements (pp8–17). Chapter V covers compliance enforcement, dispute resolution, communication, power to relax or remove difficulties, suo moto orders and practice directions, and repeal of the 2009 regulations with savings for existing licences (pp17–20). Annexures contain Form I, three Form II public-notice formats and a model transmission licence with schedule (pp21–32).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 24 Nov 2023Explanatory memorandum: Explanatory Memorandum to Draft Transmission Licence Regulations, 2023
- Dated 28 Nov 2023Public notice: Draft Transmission Licence Grant Regulations, 2023 — Public Notice
- Dated 19 Dec 2023Notice extending the date for comments: Draft Transmission Licence Regulations, 2023 — Extension of comment deadline to 26.12.2023 — Public Notice
- Dated 27 Dec 2023Hearing notice: Public hearing notice — Draft Transmission Licence Regulations, 2023
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.