Skip to content

CERC · Central Electricity Regulatory Commission

Transmission Licence (Procedure, Terms and Conditions) Regulations, 2023 — Draft

Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations, 2023

Draft regulationDated 28 Nov 2023No. L-1/270/2023/CERC dated 28.11.2023

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The draft notification publishes the full text of the Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations, 2023. It is made under the Electricity Act, 2003 and will commence on publication in the official gazette (p1). Chapter I sets the short title and commencement and defines key actors and instruments — Act, applicant, bid process coordinator, bulk consumer, CTU, deemed licensee, Designated ISTS Customer, GNA Regulations, LTTC, project and transmission plan (pp1–4). Chapter II deals with grant of licence. It lists who is eligible: entities selected through competitive bidding, entities nominated by the Central Government or its agency under the regulated tariff mechanism, and bulk consumers with load of 50 MW and above constructing a connecting line for self-consumption; a bulk consumer may instead have an existing licensee build the line (p5). It then sets the application and consultation process, using Form I, e-filing, service on DICs and CTU, website and newspaper notices in Form II, defect rectification, public objections, CTU recommendations, the Commission's own proposal notice, hearing and issue of licence in Form III or rejection (pp5–8). Chapter III addresses transmission charges: adoption under Section 63 for competitively bid projects, determination under the Section 61 tariff framework otherwise, and cost responsibility for a bulk consumer's connecting line (p8). Chapter IV lays down licence conditions: insurance, time-bound and prudent construction and operation, compliance with NLDC and RLDC directions, open access under the GNA Regulations, licence fee, prior approvals, separate accounts, inspection, information and prudential reporting, amendment and revocation of licence, lender assignment on default, and the licence term and extension arrangements (pp8–17). Chapter V covers compliance enforcement, dispute resolution, communication, power to relax or remove difficulties, suo moto orders and practice directions, and repeal of the 2009 regulations with savings for existing licences (pp17–20). Annexures contain Form I, three Form II public-notice formats and a model transmission licence with schedule (pp21–32).

Standard name
Licensing Regulations
Primary topics
Licensing and licence conditions, Transmission tariff, Open access

Read with this

Voltaic holds no final regulation made from this draft.

Proposed changes (drafts with no final yet)

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document