CERC · Central Electricity Regulatory Commission
Transmission System Availability Procedure, Appendix-III to the Terms and Conditions of Tariff Regulations, 2004
Procedure for calculation of Transmission System Availability
OrderDate not stated
Made under the Terms and Conditions of Tariff Regulations, 2004 — Appendix II: Depreciation Schedule.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This Appendix-III sets out how transmission system availability is to be computed, separately for each Regional Transmission System and for the inter-regional transmission system (p1). Paragraph 1 groups network assets into six element categories — each AC circuit, each ICT bank, each SVC together with its transformer, each switched bus reactor, each HVDC pole, and each HVDC back-to-back block — and states how each is counted, including the rule that a back-to-back block is treated as unavailable if its associated AC line is out (p1). Paragraph 2 gives the aggregate availability formulae for the AC and HVDC portions as weighted averages over those categories (p1–2), and paragraph 3 prescribes the weightage factor for each category: SIL × circuit-km for AC lines, rated MW × circuit-km for HVDC poles, rated MVA for ICTs, rated MVAR for SVCs and bus reactors, and rated MW for back-to-back blocks (p2). Annexure-I (p4) tabulates SIL by voltage level and conductor configuration, with a proviso allowing technically justified SIL values to be used for unlisted configurations if intimated to long-term transmission customers. Annexure-II (p5–6) gives the element-level availability formulae and defines the weightage and time variables.
Paragraphs 5 to 7 govern outage treatment: outages availed by other agencies for their own construction or maintenance, and RLDC-directed manual tripping of lines on over-voltage or of switched bus reactors, are deemed available (p2–3); acts of God, force majeure and grid disturbances not attributable to the licensee are excluded from total time, subject to the licensee satisfying the Member Secretary, REB on restoration time, with ERS-restored circuits counted as available (p3); and an outage that causes loss of ISGS generation is deemed to last twice the actual outage period for the affected day(s) (p3).
Read with this
The regulation
Procedures and orders made under it
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.