Summary
Summary written by software. Check the regulator's original before you rely on it.
This is an annexure of blank petition formats rather than a set of rules. It forms Appendix-I, Part-III (Transmission) of CERC's tariff framework and tells a licensee what data to file when claiming transmission tariff for an element (p1). Page 1 collects company, project, transmission-element, region/state/district identifiers and calls for the equity calculations underpinning the claim. Pages 2–3 are a loan-detail form — lender, currency, interest type, base rate, margin, caps/floors, moratorium, repayment period and frequency, drawal and repayment schedules, foreign-exchange rates — with sixteen numbered notes (p2–3) explaining each field. Page 4 is an asset-wise gross-block and depreciation form that must follow CERC's depreciation schedule. Page 5 starts a form for interest on working capital. Existing assets are reported as at 31.03.2004; all other assets as on their COD.
Read with this
The regulation
Procedures and orders made under it
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.