Skip to content

AERC · Assam Electricity Regulatory Commission

Statement of Objects and Reasons — Electricity Grid Code Regulations, 2024

Statement of Objects and Reasons

Statement of reasonsDated 9 Dec 2024

The commission's reasons for the Electricity Grid Code Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software, from pages 1 to 36 of 40. Check the regulator's original before you rely on it.

This is the Statement of Objects and Reasons (SoR) for the Assam Electricity Regulatory Commission (Electricity Grid Code) Regulations, 2024 (p1–2). It explains why AERC replaced its 2018 grid code: the Central Electricity Regulatory Commission notified the Indian Electricity Grid Code Regulations, 2023 on 29 May 2023, with a first amendment on 23 October 2024, and other directions required AERC to notify a fresh state grid code (p2). The regulations are made under section 181 of the Electricity Act, 2003 read with section 86(1)(h) (p2).

The SoR records the consultation: the draft was hosted on the Commission's website and a public notice was issued on 07.11.2024 in The Assam Tribune and Amar Asom, with objections invited by 22 November 2024 (p2). Comments came from AEGCL, APDCL, Dalmia Cement (North East), SLDC, Star Cement and DiSPA; a public hearing was held on 04.12.2024 (p3).

Most of the document is a clause-by-clause account of stakeholder comments and the Commission's decisions. It covers definitions and IEGC precedence (Chapter 2; pp4–7); grid code management and protection committees, including the GCMC and SPCC (Chapter 3; pp7–11); demand estimation (Chapter 4; pp11–12); connectivity application fees and connection points (Chapter 5; pp12–13); start-up power, infirm injection and RE commissioning documents (Chapter 6; pp13–14); operational planning, system security, demand control and demand management (Chapter 7; pp14–22); scheduling, forecasting, revision rules and renewable scheduling (Chapter 8; pp22–27); reserves and frequency bias (Chapter 9; pp27–28); telemetry (Chapter 10; p28); outage planning and post-despatch analysis (Chapter 11; pp29–30); operational coordination (Chapter 12; pp30–31); the Protection Code (Chapter 15; pp31–35); and the Transmission Metering Code (Chapter 16; pp35–36). For each, it shows whether the suggestion was accepted, modified or retained, and why.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Connectivity and GNA

Read with this

The regulation

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aerc.gov.in ↗

Report an issue with this document