AERC · Assam Electricity Regulatory Commission
Statement of Objects and Reasons — Electricity Grid Code Regulations, 2024
Statement of Objects and Reasons
Statement of reasonsDated 9 Dec 2024
The commission's reasons for the Electricity Grid Code Regulations, 2024.
Summary
Summary written by software, from pages 1 to 36 of 40. Check the regulator's original before you rely on it.
This is the Statement of Objects and Reasons (SoR) for the Assam Electricity Regulatory Commission (Electricity Grid Code) Regulations, 2024 (p1–2). It explains why AERC replaced its 2018 grid code: the Central Electricity Regulatory Commission notified the Indian Electricity Grid Code Regulations, 2023 on 29 May 2023, with a first amendment on 23 October 2024, and other directions required AERC to notify a fresh state grid code (p2). The regulations are made under section 181 of the Electricity Act, 2003 read with section 86(1)(h) (p2).
The SoR records the consultation: the draft was hosted on the Commission's website and a public notice was issued on 07.11.2024 in The Assam Tribune and Amar Asom, with objections invited by 22 November 2024 (p2). Comments came from AEGCL, APDCL, Dalmia Cement (North East), SLDC, Star Cement and DiSPA; a public hearing was held on 04.12.2024 (p3).
Most of the document is a clause-by-clause account of stakeholder comments and the Commission's decisions. It covers definitions and IEGC precedence (Chapter 2; pp4–7); grid code management and protection committees, including the GCMC and SPCC (Chapter 3; pp7–11); demand estimation (Chapter 4; pp11–12); connectivity application fees and connection points (Chapter 5; pp12–13); start-up power, infirm injection and RE commissioning documents (Chapter 6; pp13–14); operational planning, system security, demand control and demand management (Chapter 7; pp14–22); scheduling, forecasting, revision rules and renewable scheduling (Chapter 8; pp22–27); reserves and frequency bias (Chapter 9; pp27–28); telemetry (Chapter 10; p28); outage planning and post-despatch analysis (Chapter 11; pp29–30); operational coordination (Chapter 12; pp30–31); the Protection Code (Chapter 15; pp31–35); and the Transmission Metering Code (Chapter 16; pp35–36). For each, it shows whether the suggestion was accepted, modified or retained, and why.
Read with this
The regulation
- Dated 9 Dec 2024Electricity Grid Code Regulations, 2024