Skip to content

AERC · Assam Electricity Regulatory Commission

Electricity Grid Code Regulations, 2024

AERC (Electricity Grid Code) Regulations, 2024

RegulationDated 9 Dec 2024Published in the Gazette 31 Dec 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Assam Electricity Regulatory Commission (Electricity Grid Code) Regulations, 2024 are a principal state grid code for Assam. AERC issued them on 9 December 2024; the Assam Gazette carries them on 31 December 2024, and they come into force on 1 April 2025 (p1–2). They replace and repeal the 2018 AERC Electricity Grid Code (p146). They apply to every participant in and user of the intra-State transmission system — STU/AEGCL, SLDC, transmission licensees, generating stations including captive generators, distribution licensees, EHV consumers directly connected, open-access customers on InSTS, QCAs, REMCs, power exchanges and any other connected user (p1–2, p24). The Code extends to the whole State of Assam and is expressly compatible with the IEGC 2023; anything not covered falls back to IEGC 2023, IEGC prevails for inter-state/cross-border inconsistency, and CEA Grid Standards prevail over the Code (p2–4, p8).

Part I (General Code, Chapters 1–3, pp3–36) states objectives and scope, sets out the code's structure, interpretation, confidentiality, communication, dispute resolution and partial invalidity, and provides that the Code applies to pre- and post-commencement connection agreements without generally altering their terms — except where inconsistency would adversely affect network quality or security (pp3–8). Chapter 2 is the definitions chapter (pp9–26). Chapter 3 provides for code management by the Commission, a Grid Code Management Committee with defined membership and functions, functional committees for system operation, protection and transmission metering, compliance monitoring, self-audit and third-party audit, and a State Power Committee; SLDC performs committee functions until the committees are constituted (pp27–36).

Part II (Planning Code, Chapters 4–6, pp37–67) covers resource adequacy and system planning. Distribution licensees forecast demand and prepare generation procurement plans; STU prepares a rolling ten-year perspective plan and an annual five-year plan, and users submit planning data on stated schedules (pp37–42). Chapter 5 sets the connection/connectivity process for InSTS — application, fees, processing and offer timelines, connectivity agreements, site responsibility schedules, technical connection conditions, data and communication facilities — and makes STU the nodal agency (pp43–52). Chapter 6 governs start-up power and infirm power, trial runs by technology, documents and tests before COD, trial-run certificates, COD declaration and when scheduling starts (pp53–67).

Part III (Load Despatch & System Operation Code, Chapters 7–14, pp68–131) is the operating core. It covers operational planning, demand and generation estimation, demand control and post-despatch analysis (Chapter 7, pp68–81); 15-minute-block scheduling and despatch, day-ahead timelines, schedule revisions, curtailment priority, SCUC/SCED, unit shutdown, alternate supply and minimum turndown (Chapter 8, pp82–99); frequency, reserve and voltage/reactive-power management, including PRAS/SRAS/TRAS and ACE (Chapter 9, pp100–114); monitoring of generation and drawal (Chapter 10, pp115–116); annual and bi-monthly outage planning (Chapter 11, pp117–119); contingency/black-start restoration and system-state procedures (Chapter 12, pp120–125); cross-boundary safety (Chapter 13, pp126–127); and monthly, quarterly and event reporting (Chapter 14, pp128–131).

Part IV is the Protection Code (Chapter 15, pp132–139): protection protocol, settings, SPCC coordination, audits, performance indices, system protection schemes and testing. Part V is the Transmission Metering Code (Chapter 16, pp140–141): interface energy meters, automatic remote reading, checking and weekly accounting inputs. A Cyber Security Code follows at pp142–143, requiring a cyber security framework, audits, reporting and Cyber Security Committees. Part VI contains the Data Registration Code (Chapter 18, pp144–145) and Miscellaneous provisions (Chapter 19, pp146–147) on detailed procedures, power to relax and remove difficulties, repeal of the 2018 Code and savings.

The Appendices (pp148–188) supply standard and detailed planning-data formats; operational planning, protection and metering data schedules; planning standards; site responsibility and incident-report formats; the connectivity application format and a third-party protection audit template; reactive power compensation and settlement rules; the REGS forecasting/scheduling procedure with data formats; and accounting/pool settlement principles.

Standard name
Grid Code

Read with this

Commencement notices and reasons

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of AERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aerc.gov.in ↗

Report an issue with this document