Terms and Conditions for Determination of Tariff for Generation from Renewable Energy Sources (First Amendment) (3 of 2026) Regulations, 2025

Meghalaya State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff for Generation from Renewable Energy Sources) (First Amendment) (3 of 2026) Regulations, 2025

AmendmentDated 3 Jun 2026No. MSERC/RES/TARIFF-REG/2025/74 dated 3rd June 2026

Amends a regulation not yet published on Voltaic.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the First Amendment to the MSERC (Terms and Conditions for Determination of Tariff for Generation from Renewable Energy Sources) Regulations, 2025, notified by the Commission on 3 June 2026 under notification No. MSERC/RES/TARIFF-REG/2025/74 (p1). It comes into force from the date of publication in the Official Gazette of Meghalaya; the Gazette date itself is not printed (p1).

The amendment operates on the Principal Regulations in three places. First, it renumbers Regulation 4 (Eligibility Criteria) as Regulation 4 A and inserts new Regulations 4 B, 4 C and 4 D into Chapter 4 (p1–2). Regulation 4 B gives RE generating stations the right to sell power — to the distribution licensee at Commission-determined rates, to open-access consumers, and to any person within or outside the State at mutually agreed rates, subject to State policy and existing agreements — and lays out the PPA route, including the requirement that the licensee apply to the Commission for approval before signing and that the PPA run for the entire tariff period (p1–2). Regulation 4 C sets out the open access framework for RE generating stations on the State transmission and distribution systems, covering eligibility, surplus-capacity conditions, transmission and wheeling charges, loss adjustment in kind, and Commission adjudication of surplus-capacity disputes (p2–3). Regulation 4 D lists the generating station's obligations on data submission, SLDC communication and scheduling, grid discipline, protection equipment, State Grid Code compliance, economy of operation, coordination with STU/licensee, and SLDC fees and directions (p3–4).

Second, it substitutes a new text for sub-clause 5.5.1, providing that renewable energy tariff shall be a single-part tariff (Rs./kWh), ex-bus, comprising fixed cost components (p4). The document is a short operative amendment; the announced fixed cost components are not enumerated in the text as reproduced here.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Open access

Read with this

The regulation itself is not yet published on Voltaic.

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft not held as English text and 1 main regulation not held as English text.

Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mserc.gov.in ↗