MSERC · Meghalaya State Electricity Regulatory Commission
Terms and Conditions for Determination of Tariff for Generation from Renewable Energy Sources (First Amendment) Regulations, 2025 — Draft
Meghalaya State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff for Generation from Renewable Energy Sources) (First Amendment) Regulations, 2025
Draft amendmentDated 18 May 2026No. MSERC/RES/TARIFF-REG/2025/…… dated 18th May 2026
Draft
A proposal that has since been finalised as the Terms and Conditions for Determination of Tariff for Generation from Renewable Energy Sources (First Amendment) (3 of 2026) Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a pre-publication notification of the Meghalaya State Electricity Regulatory Commission, dated 18 May 2026, in which the Commission proposes to amend its 2025 regulations on tariffs for generation from renewable energy sources (p1). The notification number is left blank, confirming this is draft text rather than a notified regulation (p1).
Paragraph 1 gives the short title and provides that the amendment takes effect from the date of publication in the Meghalaya Official Gazette (p1). Paragraph 2 rewrites Chapter 4 on general conditions: existing Regulation 4 on eligibility is renumbered as 4A, and three new regulations are inserted. Regulation 4B (Sale of Power) sets out the routes by which RE generating stations may sell — to the distribution licensee at Commission-determined rates, to open-access consumers, or to any person within or outside the State at mutually agreed rates, subject to State policy and existing enforceable agreements — and requires a PPA for the entire tariff period with prior Commission approval (p1–2). Regulation 4C (Open Access) provides for non-discriminatory open access on the State transmission and distribution systems for captive use and sale, against transmission/wheeling charges and losses in kind, limited by surplus capacity, with the Commission adjudicating disputes over surplus capacity (p2–3). Regulation 4D (Obligations and duties) requires RE stations to report operating data, coordinate with the SLDC on scheduling and dispatch, install protection equipment, follow the State Grid Code and Commission directions, and pay SLDC fees (p3–4). Paragraph 3 recasts Regulation 5.5.1 to make the RE tariff a single-part, ex-bus tariff in Rs/kWh built from fixed cost components (p4).
Read with this
The regulation itself is not yet published on Voltaic.
Amendments and corrections
Earlier drafts
- Dated 18 May 2026Public notice: Renewable Energy Generation Tariff Regulations, 2025 — First Amendment — Draft — Public Notice
2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft not held as English text and 1 main regulation not held as English text.
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.