KSERC · Kerala State Electricity Regulatory Commission

Kerala Electricity Supply Code, 2005 — Sixth Amendment, 2012

Kerala Electricity Supply (Sixth Amendment) Code, 2012

AmendmentDated 30 May 2012No.641/CT/12/KSERC dated 30th May 2012

Replaced by Kerala Electricity Supply Code, 2014

See that regulation for the date it took effect and for anything it keeps in force.

Amends a regulation Voltaic does not hold.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or action taken or purported to have been taken, or proceedings initiated under such repealed regulations, shall be deemed to have been taken under this Code to the extent that same were not inconsistent with the Act.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page KSERC notification that amends the Kerala Electricity Supply Code, 2005 for the sixth time (p1). Its operative clause renumbers the existing clause 12 as sub-clause (1) and inserts a new sub-clause (2) dealing with arrears left behind by a previous owner or occupier of premises (p1). Under the new sub-clause, a purchaser who would otherwise be blocked by such arrears must deposit an amount equal to the arrears, excluding interest, with the licensee; the licensee reimburses that amount as and when it is actually realised from the previous owner or occupier. A proviso carves out two categories who need not deposit anything: an auction purchaser who obtains the property through auction by a court of law or other duly constituted authority, and an allottee of government land (p1). The Explanatory Note explains the trigger: the High Court of Kerala, in WA No. 2114 of 2009, directed the Commission to reconsider the clause because licensees struggle to recover arrears from previous owners who may hold no assets (p1). The regulation takes effect at once.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes

Read with this

Voltaic does not hold the regulation itself.

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document