KSERC · Kerala State Electricity Regulatory Commission
Kerala Electricity Supply Code, 2014
RegulationDated 31 Jan 2014In force from 1 Apr 2014No. 215/DD/T&D(Rev)2014/KSERC dated 31.01.2014
5 amendments to it are on Voltaic, the latest dated 26 Jul 2024.
Summary
Summary written by software, from pages 1 to 24 of 132. Check the regulator's original before you rely on it.
The Kerala Electricity Supply Code, 2014 is a KSERC principal regulation issued by notification dated 31 January 2014 and brought into force on 1 April 2014 (p1). It applies to all distribution licensees, including deemed licensees, and to all consumers and users in Kerala, plus persons exempted under Section 13 of the Electricity Act (p1). Pages 1–7 contain Chapter I: short title, extent, commencement, a long list of definitions and interpretation rules; the definitions fix core concepts such as consumer installation, contract demand/connected load, voltage classes, dedicated distribution system, protected load, power intensive unit and user (p1–7).
Chapter II (p8–15) sets system, safety and supply standards. It requires the licensee to develop and maintain an efficient distribution system, supply at 50 Hz, and maintain specified LT/HT/EHT voltage levels with permissible variations; it maps connected load/contract demand to supply voltage and provides for low-voltage surcharge and high-voltage rebate (p8–9). It regulates new LT connections, dedicated feeders for power intensive and other consumers, load balancing, consumer wiring, motor and pump-set installations, parallel operation of consumer generation, metering and protective equipment, step-down transformers, safe custody and damage to licensee equipment, harmonics dumping, load shedding and power restrictions, and safety certification/CEA safety compliance (p9–15).
Chapter III contains general conditions of supply: the licensee's obligation to supply on request, unelectrified-area extension, consumer classification and tariff principles, recovery of charges, annual cost-data approval process, allocation of expenditure for distribution-system extension/upgradation between licensee and consumer, publication of connection conditions, prohibitions on supply, recovery of previous consumer arrears, transfer of service connection, divided premises, reconstruction, proof of identity/ownership/address, right of way, protected load status, high-rise/building complex electrification, and load-estimation norms (p15–24).
Read with this
Amendments and corrections
- Dated 8 May 2015Kerala Electricity Supply Code, 2014 — Amendment, 2015
- Dated 11 Jan 2016Kerala Electricity Supply Code, 2014 — Amendment Code, 2016
- Dated 24 Jan 2017Kerala Electricity Supply (Amendment) Code, 2017
- Dated 22 Jan 2020Kerala Electricity Supply (Amendment) Code, 2020
- Dated 26 Jul 2024Kerala Electricity Supply Code, 2014 — Fifth Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 23 Sep 2014Kerala Electricity Supply Code (Removal of Difficulties) Orders, 2014 — First to Fourth
- Dated 2 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Fifth Order, 2015
- Dated 2 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Fifth Order, 2015
- Dated 3 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015
- Dated 23 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015
- Dated 23 Jun 2015Kerala Electricity Supply Code — Sixth Removal of Difficulties Order, 2015
- Dated 11 Jul 2016Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015 — validity extension to 30.09.2016
- Dated 26 Oct 2016Kerala Electricity Supply Code (Removal of Difficulties) Order, 2016
- Dated 26 Oct 2016Kerala Electricity Supply Code (Removal of Difficulties) Order, 2016
- Dated 20 Nov 2024Kerala Electricity Supply Code (Removal of Difficulties) Order, 2024
- Dated 20 Nov 2024Kerala Electricity Supply Code (Removal of Difficulties) Order, 2024
- Dated 6 Jan 2025Kerala Electricity Supply Code (Removal of Difficulties) Order, 2025
- Dated 6 Jan 2025Kerala Electricity Supply Code (Removal of Difficulties) Order, 2025
- Dated 9 Apr 2025Kerala Electricity Supply Code (Removal of Difficulties) (Second Order), 2025
- Dated 9 Apr 2025Kerala Electricity Supply Code (Removal of Difficulties) (Second Order), 2025
- Dated 9 Oct 2025Kerala Electricity Supply Code (Removal of Difficulties) (Third Order), 2025
- Dated 9 Oct 2025Kerala Electricity Supply Code (Removal of Difficulties) (Third Order), 2025
Consolidated copies, for reference (1)
- Dated 14 Oct 2025Kerala Electricity Supply Code, 2014 (as amended)
Other copies of these documents (2)
- Dated 22 Jan 2020Kerala Electricity Supply (Amendment) Code, 2020
- Dated 26 Jul 2024Kerala Electricity Supply Code, 2014 — Fifth Amendment Code, 2024
11 more documents belong here and are not on Voltaic: 11 copies in another language.
Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of KSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.