DERC · Delhi Electricity Regulatory Commission

Terms and Conditions for Open Access Regulations, 2005

Delhi Electricity Regulatory Commission (Terms and conditions for Open Access) Regulations, 2005.

RegulationDated 3 Jan 2006No. F.11(133)/2003/Power/12/ No. F. 8(18)/DERC/2005-06/3635. dated 3rd January, 2006

2 amendments to it are on Voltaic, the latest dated 19 Mar 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Delhi Electricity Regulatory Commission's principal regulation opening the intra-state transmission and distribution systems of Delhi to third-party use, notified on 3 January 2006 under sections 39, 40, 42 and 181 of the Electricity Act, 2003. It comes into force on gazette publication (the gazette date itself is not printed) and extends to the National Capital Territory of Delhi (p1).

The regulation first settles who may use the wires and on what basis. Licensees, generating companies, captive generating plants and intending consumers are eligible for non-discriminatory transmission access subject to available capacity and to transmission charges, and for distribution access subject to wheeling charges, surcharge and additional surcharge determined by the Commission from time to time (p2–3). Transmission open access is allowed immediately; distribution open access is phased in by connected-load thresholds starting at five MW from 1 July 2007, falling to three MW and then one MW by 1 July 2008, with sub-one-MW consumers left to later review by the Commission (p3–4).

The middle of the document is operational machinery: savings for persons already holding open access under existing arrangements (p4); a two-category split into short-term and long-term customers (p4); allocation priority favouring long-term users and first-come-first-serve, with a power for the Commission to deviate by order (p4–5); who determines available capacity — STU for long-term transmission, SLDC for short-term transmission and for all distribution cases — and how disputes go to the Commission (p5–6); the application procedure with a processing-fee table and maximum processing times (p6–7); treatment of surrendered or under-utilised capacity (p7–8); the basket of charges payable, including scheduling, UI and reactive energy charges, and loss adjustment (p8); curtailment priority with pro-rata reduction of charges (p8); metering, grid-code compliance and other conditions (p9); and a public information-disclosure duty on the SLDC (p9). The closing regulations cover grievance handling and reference to the Commission, the Commission's power to issue orders and practice directions, to remove difficulties, to amend, and to conduct inquiries under the DERC (Conduct of Business) Regulations, 2001 (p10).

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Congestion and curtailment

Read with this

Procedures and orders made under it

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of DERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.