DERC · Delhi Electricity Regulatory Commission

Captive Generating Plant Status Verification Procedure under the Electricity Rules, 2005 — Draft

Procedure for verification of Captive Generating Plant (CGP) status in accordance to requirements in Rule 3 of the Electricity Rules, 2005

Draft procedureDated 1 Nov 2019

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Delhi Electricity Regulatory Commission has released a draft procedure for verifying whether a power plant qualifies as a Captive Generating Plant (CGP) under Rule 3 of the Electricity Rules, 2005. It is made under Regulations 12 and 17 of the DERC (Terms and Conditions for Open Access) Regulations, 2005, and applies to CGPs and captive users in Delhi (p1). The first part reproduces the statutory framework: Rule 3 of the Electricity Rules, 2005, including the ownership and consumption tests and the special rules for cooperative societies, associations of persons and SPV-identified units, plus the relevant Electricity Act, 2003 definitions and section 9 (pp1-3). It then explains the 26% ownership and 51% annual consumption conditions and the consequences of non-compliance (pp3-4).

The operative procedure starts at page 4. It sets out what must be verified for different ownership structures - single captive user, two or more users or associations of persons, cooperative societies, partnership firms/LLPs and SPV units - and requires the Verifying Authority to check minimum equity before granting open access (pp4-5). It states that short-, medium- and long-term open access consumers need not provide a bank guarantee, letter of credit or fixed deposit as payment security for cross subsidy surcharge and/or additional surcharge (p5). Metering provisions require separate special energy meters with real-time SLDC communication, segregated metering for embedded CGPs, and monthly data submission (p5).

The core verification procedure (pp5-10) lists the affidavits, chartered accountant certificates, shareholding records and other documents to be filed for companies, partnership firms/LLPs, associations of persons, SPVs and cooperative societies; makes verification annual; sets timelines for change intimation and consumption data; and authorises SLDC Delhi to compute CGP status. It prescribes how 51% consumption is calculated, including auxiliary consumption and first-year financial-year counting from grant of open access (pp8-9). It then covers ceasing of CGP status, default by a shareholder, monthly and annual recovery of cross subsidy surcharge and additional surcharge with adjustment/refund and interest, and disconnection for non-payment (pp9-11). Formats I-VI provide the certificate and energy-data templates (pp12-17).

Standard name
Open Access Regulations
Primary topics
Captive status, Open access, Metering

Read with this

The regulation

Procedures and orders made under it

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗