MERC · Maharashtra Electricity Regulatory Commission
Public Notice — Extension of Last Date for Comments, Objections and Counter Submissions on Draft Regulations
Extension of last date for filing comments, suggestions and / or objections and counter submissions on Draft Regulations
Notice extending the date for comments on a draftDated 9 Oct 2026
Draft
Voltaic holds no final regulation made from this draft.
Notice extending the date for comments on a draft that is not on Voltaic.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page public notice from the Maharashtra Electricity Regulatory Commission extending the public-comment timeline on six sets of draft regulations (p1).
It recalls that, by a Public Notice dated 21 September 2026, the Commission had invited comments, suggestions and/or objections on six drafts: Intra State Transmission Connectivity and General Network Access; Distribution Open Access; Grid Interactive Rooftop Renewable Energy Generating Systems; Battery Energy Storage Systems; the Second Amendment to Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation; and the Second Amendment to the Renewable Purchase Obligation / REC Framework regulations (p1).
The notice records that the earlier deadlines were 12 October 2026 for comments and 15 October 2026 for counter submissions. In view of stakeholder requests, it moves these to 26 October 2026 (5 PM) for comments, suggestions and objections, and 29 October 2026 for counter submissions (p1). It also states that all future communication on the matter will be only through the MERC website (p1).
The notice is signed by the Secretary, MERC, and dated 9 October 2026 at Mumbai (p1). It changes no substantive provision of any draft and serves purely to fix the new consultation cut-off dates for anyone wishing to be heard on those drafts.
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.