MERC · Maharashtra Electricity Regulatory Commission
Proposed Amendments to Regulations for Implementation of the Maharashtra Renewable Energy and Energy Storage Policy, 2025-26 to 2035-36 — Explanatory Memorandum
Proposed Amendments to the MERC Regulations for Implementation of the Maharashtra Renewable Energy and Energy Storage Policy, 2025-26 to 2035-36
Explanatory memorandum to a draftDated 22 Sep 2026
Draft
Voltaic holds no final regulation made from this draft.
Explanatory memorandum to a draft that is not on Voltaic.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a Maharashtra Electricity Regulatory Commission explanatory memorandum dated 22 September 2026 (p1). It accompanies seven draft instruments — new regulations on intra-State transmission connectivity and General Network Access, distribution open access, grid-interactive rooftop renewable energy, and Battery Energy Storage Systems, plus second amendments to the forecasting/scheduling/deviation, RPO and State Grid Code regulations — intended to implement the Maharashtra Renewable Energy and Energy Storage Policy, 2025-26 to 2035-36 notified by Government Resolution dated 18 March 2026 (pp2–3). The memorandum is not operative text; it says the Regulations as finally notified prevail (p23), and it invites stakeholder comments (pp1, 23).
Sections 1–5 give the rationale: statutory powers under the Electricity Act, the State Policy’s RE and storage targets, the need for change as variable RE rises, and the working-group and consultation record behind the proposals (pp1–9). This part explains why existing arrangements for connectivity, storage, scheduling, deviation settlement, banking, open access and metering are considered inadequate, and cites operating and planning data (pp5–9).
Section 6 sets the common regulatory design: harmonised definitions; activity-based treatment of energy storage rather than classifying it only as generation or consumption; aggregation of “Contracted RE Capacity”; fixed solar/non-solar hours; banking slots distinct from Time-of-Day tariff periods; two-part banking and standby charges; protection of existing contracts with an option to migrate; and a storage requirement for larger RE systems with alternative capacity/duration configurations (pp9–11).
Section 7 summarises the seven drafts regulation by regulation. The intra-State connectivity/GNA draft aligns State transmission access with the CERC GNA model, separates connectivity from access, and covers eligibility, bank guarantees, temporary GNA, the State Open Access Registry, transfer/splitting and relinquishment (pp11–13). The Distribution Open Access draft consolidates conventional and green open access, adds distribution connectivity provisions, differential access, storage connectivity, charge exemptions and revised banking charges (pp13–14). The rooftop RE draft deals with migration, capacity and injection limits, storage for larger systems, metering choices, Virtual Net Metering and banking slots (pp14–16). The BESS draft covers classification, planning and procurement, connectivity, charge treatment, grid charging, inter-State sale, system-operator procedures and metering (pp17–19). The F&S amendment proposes a shift from Available Capacity-based deviation to a blended/scheduled-generation basis through parameter “X”, tighter volume limits, WS Seller parity, storage deviation treatment, QCA de-pooling and auxiliary-consumption treatment (pp19–21). The RPO amendment extends the RPO and ESO trajectories to FY 2035-36 (p21), and the Grid Code amendment brings BESS and RE-plus-storage into scheduling, dispatch, DSM and ancillary-service frameworks (p22).
Annexure A is the Working Group report: executive summary, policy background, working-group process, stakeholder themes, detailed analysis of connectivity/open access, RE-DSM, banking and standby cost recovery, other policy implications, and recommendations (pp24–102). Annexures 2 and 3 list stakeholders and summarise stakeholder comments by theme (pp105–110).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.