Skip to content

CERC · Central Electricity Regulatory Commission

Draft RLDC Fees and Charges Regulations, 2024 — Explanatory Memorandum

Draft Central Electricity Regulatory Commission (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2024

Explanatory memorandum to a draftReleased with the notice dated 4 Apr 2024

Explanatory memorandum to the draft Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Explanatory Memorandum (EM) accompanying the draft CERC (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2024, which the Commission proposes for the control period 01.04.2024–31.03.2029 (p1). The EM explains why the 2019 RLDC Regulations, notified on 05.04.2019 for the control period ending 31.03.2024, are being replaced, and walks through the proposed changes (p1–2).

The background sets out CERC's power under s.178(2)(h) read with s.28(4) of the Electricity Act, 2003 to specify RLDC fees and charges, and records that the 2019 control period has ended (p1). Section 2.0 reviews the 2019 Regulations against the GNA Regulations 2022, the Grid Code 2023, system developments and the experience of 2019–24 (p2). The EM then describes proposed changes to definitions — replacing LTA/MTOA with GNA, POSOCO with Grid-India, linking the late-payment surcharge base rate to the LPS Rules 2022, adding default-related definitions and a reference rate of interest, and revising 'Seller' and 'Users' (p2–3).

Subsequent sections explain registration and de-registration, including a longer default period before de-registration (p3); segregation of RLDC/NLDC functions into market operation, registry and system operation (p3–4); merger of CAPEX and REPEX, apportionment rules and treatment of force majeure/change-in-law expenditure (p4–5); retention of user provisions (p5); a single fees-and-charges petition to be filed by NLDC for all RLDCs and NLDC (p5); retained reconciliation, truing-up and mid-term review (p5); capital cost, additional capitalisation and de-capitalisation rules with new IDC-on-normative-loan provisions (p5–6); retained debt-equity ratio (p6); the two-part fee structure of LDC Fees and Annual LDC Charges with six components (p6–7); computation of ALC, including IWC, O&M and HR expenses (p7–8); continuation of the LDC Development Fund with the Contingency Fund removed (p8–9); computation and recovery of registration fees and monthly LDC charges, including GNA-based allocation and exemptions for power exchanges and QCAs (p9–10); the performance-linked incentive/PRP framework and its DPE/MoP backdrop (p11–16); revised Key Performance Indicators and annual revision procedure (p16–17); one-time certification incentives for RLDC/NLDC employees (p17–18); retained billing and payment provisions (p18); late payment surcharge aligned with the LPS Rules (p18); a new Payment Security Mechanism with Letter of Credit and regulation of access for defaulters (p18–19); retained rebate provisions (p19); and a depreciation schedule aligned with the 2024 Tariff Regulations (p19).

Primary topics
SLDC and RLDC fees and charges, Return, financing and working capital, Operating costs and other income

Read with this

Other copies of these documents (1)

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document