CERC · Central Electricity Regulatory Commission
Draft RLDC Fees and Charges Regulations, 2024 — Explanatory Memorandum
Draft Central Electricity Regulatory Commission (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2024
Explanatory memorandum to a draftReleased with the notice dated 4 Apr 2024
Draft
The draft has since been finalised as the Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2024.
Explanatory memorandum to the draft Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Explanatory Memorandum (EM) accompanying the draft CERC (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2024, which the Commission proposes for the control period 01.04.2024–31.03.2029 (p1). The EM explains why the 2019 RLDC Regulations, notified on 05.04.2019 for the control period ending 31.03.2024, are being replaced, and walks through the proposed changes (p1–2).
The background sets out CERC's power under s.178(2)(h) read with s.28(4) of the Electricity Act, 2003 to specify RLDC fees and charges, and records that the 2019 control period has ended (p1). Section 2.0 reviews the 2019 Regulations against the GNA Regulations 2022, the Grid Code 2023, system developments and the experience of 2019–24 (p2). The EM then describes proposed changes to definitions — replacing LTA/MTOA with GNA, POSOCO with Grid-India, linking the late-payment surcharge base rate to the LPS Rules 2022, adding default-related definitions and a reference rate of interest, and revising 'Seller' and 'Users' (p2–3).
Subsequent sections explain registration and de-registration, including a longer default period before de-registration (p3); segregation of RLDC/NLDC functions into market operation, registry and system operation (p3–4); merger of CAPEX and REPEX, apportionment rules and treatment of force majeure/change-in-law expenditure (p4–5); retention of user provisions (p5); a single fees-and-charges petition to be filed by NLDC for all RLDCs and NLDC (p5); retained reconciliation, truing-up and mid-term review (p5); capital cost, additional capitalisation and de-capitalisation rules with new IDC-on-normative-loan provisions (p5–6); retained debt-equity ratio (p6); the two-part fee structure of LDC Fees and Annual LDC Charges with six components (p6–7); computation of ALC, including IWC, O&M and HR expenses (p7–8); continuation of the LDC Development Fund with the Contingency Fund removed (p8–9); computation and recovery of registration fees and monthly LDC charges, including GNA-based allocation and exemptions for power exchanges and QCAs (p9–10); the performance-linked incentive/PRP framework and its DPE/MoP backdrop (p11–16); revised Key Performance Indicators and annual revision procedure (p16–17); one-time certification incentives for RLDC/NLDC employees (p17–18); retained billing and payment provisions (p18); late payment surcharge aligned with the LPS Rules (p18); a new Payment Security Mechanism with Letter of Credit and regulation of access for defaulters (p18–19); retained rebate provisions (p19); and a depreciation schedule aligned with the 2024 Tariff Regulations (p19).
Read with this
The regulation
Other copies of these documents (1)
Earlier drafts
- Dated 4 Apr 2024Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2024
- Dated 4 Apr 2024Public notice: Fees and Charges of Regional Load Despatch Centre Regulations, 2024 — Public Notice on Draft
- Dated 6 May 2024Notice extending the date for comments: Public Notice — Extension of Comments Deadline on Draft RLDC Fees and Charges Regulations, 2024
- Dated 26 May 2024Hearing notice: Public hearing notice — Draft Fees and Charges of Regional Load Despatch Centre Regulations, 2024
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.