CERC · Central Electricity Regulatory Commission
Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2024
Central Electricity Regulatory Commission (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2024
RegulationDated 12 Jul 2024No. L-1/271/2024/CERC dated 12.07.2024
Summary
Summary written by software, from pages 1 to 40 of 77. Check the regulator's original before you rely on it.
This is CERC's principal regulation fixing how the Regional Load Despatch Centres (RLDCs) and the National Load Despatch Centre (NLDC) recover their costs from grid users for the five-year control period 1.4.2024–31.3.2029 (p1). It is issued under Section 178 read with Section 28(4) of the Electricity Act, 2003, and takes effect from Gazette publication (date not printed) (p1).
Chapters 1 and 2 establish the vocabulary and the regime: who is a "user", how users register with an RLDC or NLDC before commencing grid access, what functions the LDCs perform (market operation, registry, system operation), and how Grid-India plans and gets approval for capital expenditure (p1–11). Chapter 3 sets the process: truing up of the 2019-24 charges, a single NLDC-led petition for 2024-29 with public consultation, prudence check of CAPEX, and end-of-period truing up with annual reconciliation and a possible mid-term review (p11–14).
Chapters 4 to 6 give the computational rules — capital cost, additional capitalisation and de-capitalisation, debt-equity ratio, then the building blocks of Annual LDC Charges: return on equity, interest on loan, depreciation, O&M expenses, HR expenses and interest on working capital (p14–23). Chapter 7 creates and governs the Load Despatch Centre Development Fund (p23–24).
Chapter 8 is the money chapter: registration fees by category and size band, the split of monthly LDC charges across three user categories, and the tariff formulas for transmission licensees (per ckt-km and per MVA) and for injecting and drawing entities (per MW of capacity or GNA) (p24–29). Chapter 9 deals with the Performance Linked Incentive, its KPI framework and the employee certification incentive (p29–31). Chapter 10 covers billing, late payment surcharge, payment security mechanism, curtailment of access for defaulters, rebates, dispute resolution and relax/removal-of-difficulty powers (p31–35). The Appendix carries the tariff filing forms and formats (p36–40).
Read with this
Other copies of these documents (1)
Earlier drafts
- Dated 4 Apr 2024Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2024
- Released with the notice dated 4 Apr 2024Explanatory memorandum: Draft RLDC Fees and Charges Regulations, 2024 — Explanatory Memorandum
- Dated 4 Apr 2024Public notice: Fees and Charges of Regional Load Despatch Centre Regulations, 2024 — Public Notice on Draft
- Dated 6 May 2024Notice extending the date for comments: Public Notice — Extension of Comments Deadline on Draft RLDC Fees and Charges Regulations, 2024
- Dated 26 May 2024Hearing notice: Public hearing notice — Draft Fees and Charges of Regional Load Despatch Centre Regulations, 2024
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.