Skip to content

NERC · Nagaland Electricity Regulatory Commission

Standards of Performance for the Distribution and Transmission of the Licensee Regulations, 2012

Nagaland Electricity Regulatory Commission (Standards of Performance for the Distribution and Transmission of the Licensee) Regulations, 2012

RegulationDated 31 Jan 2012No.NERC/REGN/2012(A) dated 31st Jan '12

1 amendment to it is on Voltaic, dated 17 May 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on nerc.org.in ↗

Summary

Summary written by software, from pages 1 to 47 of 51. Check the regulator's original before you rely on it.

This is NERC's principal standards-of-performance regulation for distribution and transmission licensees in Nagaland, notified on 31 January 2012 (p1). It is made under the Electricity Act, 2003 and comes into force on Gazette notification. Chapter 1 carries definitions, objectives, the split between guaranteed and overall standards, the compensation framework, reporting duties, force majeure exemptions and Commission powers (pp1–11). Chapter 2 imports safety obligations from the Indian Electricity Rules, 1956 and IS:3043, with accident reporting duties (pp12–13). Chapter 3 prescribes complaint registration, unique complaint numbers, consumer service centres and toll-free fuse-off call arrangements (pp14–16). Chapter 4 sets guaranteed distribution standards for restoration of supply, voltage and harmonics quality, meter and billing complaints, new connections, transfers and reconnection, differentiated by urban, rural and remote areas (pp17–26). The table at pp27–30 states compensation payable when those guaranteed standards are breached. Chapter 5 sets overall distribution standards: percentage achievement targets, voltage unbalance, billing mistakes, faulty meters and reliability indices CAIFI and CAIDI (pp31–36). Chapter 6 sets guaranteed transmission standards for voltage and frequency variation (pp38–40). Chapter 7 sets overall transmission standards: feeder and substation availability, voltage unbalance, neutral displacement, voltage variation index, reliability indices and system adequacy (pp41–46). Page 47 gives a distribution reporting format.

Standard name
Standards of Performance
Primary topics
Standards of performance, Power quality, Transmission availability and outages

Read with this

Voltaic last read NERC's website for final documents on 1 Oct 2026. A document NERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of NERC's website on 1 Oct 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on nerc.org.in ↗

Report an issue with this document