Standards of Performance for the Distribution and Transmission of the Licensee (First Amendment) Regulations, 2024

Nagaland Electricity Regulatory Commission (Standards of Performance for the Distribution and Transmission of the Licensee) (First Amendment) Regulations, 2024

AmendmentDated 17 May 2024No.NERC/REGN/T-15/2021 (Pt-II) dated 17th May,'24

Amends the Standards of Performance for the Distribution and Transmission of the Licensee Regulations, 2012.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on nerc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short, single-clause amendment by the Nagaland Electricity Regulatory Commission to its 2012 Standards of Performance regime. It is issued as the Commission's (Standards of Performance for the Distribution and Transmission of the Licensee) (First Amendment) Regulations, 2024, under sections 181(2)(za) and (zb) read with sections 57 and 59 of the Electricity Act, 2003, and it says expressly that it is in line with the Ministry of Power's Electricity (Rights of Consumers) Amendment Rules, 2024 of 22 February 2024 (p1).

The operative change is to Regulation 4.4(1) of the Principal Regulations, and only to the limb dealing with release of new connections where supply can be met from the existing network. Within that limb it resets the working-day limits for LT connections, differentiated by four area categories — metropolitan, urban, rural and remote (p1). No other part of Regulation 4.4(1) is touched.

The Regulations take effect from the date of notification in the Nagaland Gazette, and the text does not print that Gazette date; the gazette copy is endorsed to the Department of Printing & Stationery on the same day the notification is signed (p1–2). Page 2 carries only the signed endorsement and a distribution list of nine state officials and departments, largely Nagaland Power Department officers (p2). For an analyst, the document matters as the route by which the state service standards for new LT connections were moved onto the new consumer-rights timelines; it is not a free-standing code.

Standard name
Standards of Performance
Primary topics
Standards of performance, New connections and load changes

Read with this

Voltaic last read NERC's website for final documents on 1 Oct 2026. A document NERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on nerc.org.in ↗

Report an issue with this document