Skip to content

KERC · Karnataka Electricity Regulatory Commission

Pre-paid Smart Metering Regulations, 2024

Karnataka Electricity Regulatory Commission (Pre-paid Smart Metering), Regulations, 2024

RegulationDated 6 Mar 2024In force from 1 Apr 2024KERC/6/DDD/F-1335/2023-24/1458 dated 06.03.2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Karnataka Electricity Regulatory Commission notifies a new principal regulation allowing electricity consumers in the State to take supply through pre-paid smart meters, replacing an arrangement where only temporary installations had mandated pre-paid meters and Government buildings could opt in (p1–2). The Commission issued draft regulations, took stakeholder comments and held a public hearing on 30.10.2023 before notifying (p1).

The regulation is made under s.47(5), s.86 and s.181 of the Electricity Act 2003 (p2), comes into force on 01.04.2024 and applies to the whole State (p2). It applies to all categories of consumers, new and existing, but the choice of a pre-paid smart meter is the consumer's — except for temporary installations, where it is mandatory (p4).

Clauses 2 defines the technical and commercial vocabulary (AMI, smart meter, pre-paid meter, consumption charges, disconnection/re-connection, TOD tariff, security deposit) and seats undefined terms in the Act, the Conditions of Supply and other KERC regulations (p2–3). Clause 3 sets the application route: the consumer may buy the meter from the licensee's retail outlets at own cost, with meter data communicated to the licensee at least daily plus a quarterly physical read, and provides for automatic revision of sanctioned load where recorded maximum demand repeatedly exceeds it (p4–5). Clause 4 bars any security deposit for a new pre-paid connection and requires existing deposits to be adjusted and settled on migration (p5). Clauses 5–6 lay down metering, communication, recharge, billing and auto-disconnection mechanics, including a worked illustration and process flow table (p5–10). Clause 7 covers electricity tax collected at recharge; clause 8 governs migration from post-paid; clause 9 covers temporary and permanent disconnection; clauses 10–11 cover meter replacement and licensee training (p10–12). Clauses 12–15 reserve interpretation, amendment, difficulty-removal and relaxation powers to the Commission (p12).

Standard name
Metering Regulations
Primary topics
Metering, Billing and payment, New connections and load changes

Read with this

Earlier drafts

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document