KERC · Karnataka Electricity Regulatory Commission
Pre-paid Smart Metering Regulations, 2023 — Draft
Karnataka Electricity Regulatory Commission (Pre-paid Smart Metering), Regulations, 2023
Draft regulationDated 4 Aug 2023No: KERC/6/DDD/F-1335/2023-24/462 dated 04.08.2023
Draft
A proposal that has since been finalised as the Pre-paid Smart Metering Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
KERC issued this draft on 4 August 2023 to open consultation on regulating pre-paid smart metering across Karnataka (p1–2). The preamble records that only temporary installations are presently covered by prepaid-meter orders and that prepaid meters in Government buildings are merely optional, so the Commission proposes a framework for consumers who want a prepaid connection (p1). Stakeholders are asked to file comments within thirty (30) days of the draft's publication in the official gazette, addressed to the Secretary (p2).
Regulations 1–2 set the title, commencement on gazette publication, statewide application, and the working vocabulary — the Act, Advanced Metering Infrastructure, consumption charges, disconnection and re-connection, prepaid meter, security deposit and smart meter (p2–3).
Regulation 3 makes the facility available to all categories of consumers, new and existing, at the consumer's option, and sets the procedure: application to the licensee, purchase of the meter by the consumer at his own cost, daily remote plus quarterly physical reading, consumer-facing consumption data, disapplication of Section 56, and treatment of recorded maximum demand above sanctioned load (p4–5).
Regulation 4 deals with security deposit in new prepaid connections, on migration and on conversion back to post-paid (p5). Regulations 5–7 cover meter conformity and testing, recharge channels, AMI compatibility, auto-reconnection, billing components and daily computation, recharge amounts and low-balance alerts, automatic disconnection, and electricity tax handling (p5–8). Regulation 8 governs migration from post-paid, Regulation 9 permanent disconnection and restoration, Regulations 10–11 meter replacement and licensee training (p8–10), and Regulations 12–15 reserve interpretation, amendment, difficulty-removal and relaxation powers to the Commission (p10).
Read with this
The regulation
- Dated 6 Mar 2024Pre-paid Smart Metering Regulations, 2024
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.