Skip to content

PSERC · Punjab State Electricity Regulatory Commission

Conduct of Business (6th Amendment) and Generation, Transmission, Wheeling and Retail Supply Tariff (2nd Amendment) Regulations, 2023 — Order

In the matter of Punjab State Electricity Regulatory Commission (Conduct of Business) (6th Amendment) Regulations, 2023 and Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) (2nd Amendment) Regulations, 2023

OrderDated 31 May 2023

Read with a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is PSERC's order of 31 May 2023 (p1, p25) disposing of objections to two draft amendment regulations and approving them with modifications: the PSERC (Conduct of Business) (6th Amendment) Regulations, 2023 and the PSERC (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) (2nd Amendment) Regulations, 2023. The driver is Rule 14 of the Ministry of Power's Electricity (Amendment) Rules, 2022, in force from 29.12.2022, which requires the Commission to specify a price adjustment formula for monthly automatic pass-through of fuel and power purchase cost variation into consumer tariffs, trued up annually (p1).

Part I sets out the background: the draft notifications, a newspaper public notice dated 17.03.2023, a public hearing on 24.03.2023, four objectors — three industry bodies and PSPCL — and PSPCL's replies (p2).

Part II records the objections, PSPCL's replies and the Commission's decisions. On the general objections (Section A) the Commission rejects pleas to keep the existing quarterly FCA after regulatory scrutiny and holds that the monthly mechanism follows from the 2022 Rules, which are in force (p3, p5). The clause-by-clause review of Appendix 7 (Section B) is the substance: the FPPAS formula is narrowed to include only variation in fuel cost of PSPCL's own thermal generating stations, with own hydel generation excluded because its full fixed cost is recovered through the ARR (p8, p22); the surcharge for a billing month, including any carry-forward, is capped at 40 paise/kWh to avoid tariff shock (p14); the (n+2) month recovery timeline is retained despite PSPCL's request for (n+3) (p12); the forfeiture of recovery rights for missed timelines is kept as required by the Rules (p13); and the Commission clarifies that banking transactions continue to be accounted as power purchase and that bulk sale means sales other than to the licensee's own consumers (p19–20, p22). It declines to fold in the draft Electricity (Rights of Consumers) Amendment Rules, 2023 (p15–16).

The order concludes that no further changes are needed and approves both amendment regulations with the modifications noted (p24–25), signed by Member Paramjeet Singh and Chairperson Viswajeet Khanna (p25).

Standard name
Conduct of Business Regulations, Multi Year Tariff Regulations
Primary topics
Fuel and power purchase cost adjustment, ARR and true-up, Energy banking

Read with this

Voltaic does not hold the regulation itself.

Procedures and orders made under it

Proposed changes (drafts with no final yet)

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document