Conduct of Business (6th Amendment) and Generation, Transmission, Wheeling and Retail Supply Tariff (2nd Amendment) Regulations, 2023 — Order
In the matter of Punjab State Electricity Regulatory Commission (Conduct of Business) (6th Amendment) Regulations, 2023 and Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) (2nd Amendment) Regulations, 2023
OrderDated 31 May 2023
Read with a regulation Voltaic does not hold.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is PSERC's order of 31 May 2023 (p1, p25) disposing of objections to two draft amendment regulations and approving them with modifications: the PSERC (Conduct of Business) (6th Amendment) Regulations, 2023 and the PSERC (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) (2nd Amendment) Regulations, 2023. The driver is Rule 14 of the Ministry of Power's Electricity (Amendment) Rules, 2022, in force from 29.12.2022, which requires the Commission to specify a price adjustment formula for monthly automatic pass-through of fuel and power purchase cost variation into consumer tariffs, trued up annually (p1).
Part I sets out the background: the draft notifications, a newspaper public notice dated 17.03.2023, a public hearing on 24.03.2023, four objectors — three industry bodies and PSPCL — and PSPCL's replies (p2).
Part II records the objections, PSPCL's replies and the Commission's decisions. On the general objections (Section A) the Commission rejects pleas to keep the existing quarterly FCA after regulatory scrutiny and holds that the monthly mechanism follows from the 2022 Rules, which are in force (p3, p5). The clause-by-clause review of Appendix 7 (Section B) is the substance: the FPPAS formula is narrowed to include only variation in fuel cost of PSPCL's own thermal generating stations, with own hydel generation excluded because its full fixed cost is recovered through the ARR (p8, p22); the surcharge for a billing month, including any carry-forward, is capped at 40 paise/kWh to avoid tariff shock (p14); the (n+2) month recovery timeline is retained despite PSPCL's request for (n+3) (p12); the forfeiture of recovery rights for missed timelines is kept as required by the Rules (p13); and the Commission clarifies that banking transactions continue to be accounted as power purchase and that bulk sale means sales other than to the licensee's own consumers (p19–20, p22). It declines to fold in the draft Electricity (Rights of Consumers) Amendment Rules, 2023 (p15–16).
The order concludes that no further changes are needed and approves both amendment regulations with the modifications noted (p24–25), signed by Member Paramjeet Singh and Chairperson Viswajeet Khanna (p25).
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
- Dated 7 Sep 2006Conduct of Business (1st Amendment) Regulations, 2006
- Dated 8 Aug 2012Conduct of Business (Second Amendment) Regulations, 2012
- Dated 7 May 2013Conduct of Business (Third Amendment) Regulations, 2013
- Dated 14 May 2014Conduct of Business Regulations, 2005 — Fourth Amendment, 2014
- Dated 16 Mar 2020Conduct of Business (Fifth Amendment) Regulations, 2020
- Dated 6 Dec 2023Conduct of Business (7th Amendment) Regulations, 2023
- Dated 24 Jul 2026Conduct of Business Regulations, 2005 — 9th Amendment, 2026
- Dated 19 Aug 2026Conduct of Business Regulations, 2005 — 10th Amendment, 2026
Procedures and orders made under it
- Dated 22 Feb 2018Conduct of Business — Office Order
- Dated 4 Dec 2023Conduct of Business Regulations, 2005 — 7th Amendment, 2023 — Order
Proposed changes (drafts with no final yet)
- Dated 21 May 2024Conduct of Business Regulations, 2005 — 8th Amendment, 2024 — Draft
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.