Conduct of Business (Fifth Amendment) Regulations, 2020

Punjab State Electricity Regulatory Commission (Conduct of Business) (Fifth Amendment) Regulations, 2020

AmendmentDated 16 Mar 2020Published in the Gazette 17 Mar 2020No. PSERC/Secy./Regu. 148.- dated The 16th March, 2020

Amends a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page Punjab gazette notification dated 16 March 2020 and published on 17 March 2020, by which the Punjab State Electricity Regulatory Commission makes the Fifth Amendment to the PSERC (Conduct of Business) Regulations, 2005 (p1). Its single operative change is the wholesale substitution of Appendix-7, the Fuel Cost Adjustment (FCA) formula that the parent regulations cross-refer to at Regulation 55 (p1).

The substituted Appendix-7 defines the quarterly Adjustment Amount as the sum of two components: the change in generation cost at the licensee's own thermal stations and the change in power purchase cost from all thermal stations under long-term contracts, both arising from fuel-cost variation beyond the distribution licensee's control (p1–2). It then sets how that amount becomes a consumer charge — an energy rate per kWh, a rate per kVAh scaled by average power factor, and a separate brake-horse-power-based charge for flat-rate agricultural pump consumers (p2). The divisor is the units projected to be billed in the quarter, estimated by applying the Commission-approved annual sales growth rate to actual sales of the same quarter of the previous year (p2).

The formula is subject to four conditions: the Commission may review it at any stage; the amount is computed on Commission-fixed norms for station heat rate, coal transit loss, auxiliary consumption and T&D losses; and a quarterly cycle applies under which Q1 and Q2 FCA is worked out by the licensee and levied from 1 October and 1 January respectively, while Q3 and Q4 FCA is submitted with authenticated data by February-end and May-end for Commission approval by end-March and end-June, and charged from April and July (p2).

The document binds the distribution licensee, which computes and levies the FCA, and indirectly consumers, who pay it. Analysts should note the mismatch between the instrument's title and its substance: a tariff-mechanics formula is carried inside the Commission's conduct-of-business regulations.

Standard name
Conduct of Business Regulations
Primary topics
Fuel and power purchase cost adjustment, Agricultural supply

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document