Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a two-page Punjab gazette notification dated 16 March 2020 and published on 17 March 2020, by which the Punjab State Electricity Regulatory Commission makes the Fifth Amendment to the PSERC (Conduct of Business) Regulations, 2005 (p1). Its single operative change is the wholesale substitution of Appendix-7, the Fuel Cost Adjustment (FCA) formula that the parent regulations cross-refer to at Regulation 55 (p1).
The substituted Appendix-7 defines the quarterly Adjustment Amount as the sum of two components: the change in generation cost at the licensee's own thermal stations and the change in power purchase cost from all thermal stations under long-term contracts, both arising from fuel-cost variation beyond the distribution licensee's control (p1–2). It then sets how that amount becomes a consumer charge — an energy rate per kWh, a rate per kVAh scaled by average power factor, and a separate brake-horse-power-based charge for flat-rate agricultural pump consumers (p2). The divisor is the units projected to be billed in the quarter, estimated by applying the Commission-approved annual sales growth rate to actual sales of the same quarter of the previous year (p2).
The formula is subject to four conditions: the Commission may review it at any stage; the amount is computed on Commission-fixed norms for station heat rate, coal transit loss, auxiliary consumption and T&D losses; and a quarterly cycle applies under which Q1 and Q2 FCA is worked out by the licensee and levied from 1 October and 1 January respectively, while Q3 and Q4 FCA is submitted with authenticated data by February-end and May-end for Commission approval by end-March and end-June, and charged from April and July (p2).
The document binds the distribution licensee, which computes and levies the FCA, and indirectly consumers, who pay it. Analysts should note the mismatch between the instrument's title and its substance: a tariff-mechanics formula is carried inside the Commission's conduct-of-business regulations.
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
- Dated 7 Sep 2006Conduct of Business (1st Amendment) Regulations, 2006
- Dated 8 Aug 2012Conduct of Business (Second Amendment) Regulations, 2012
- Dated 7 May 2013Conduct of Business (Third Amendment) Regulations, 2013
- Dated 14 May 2014Conduct of Business Regulations, 2005 — Fourth Amendment, 2014
- Dated 6 Dec 2023Conduct of Business (7th Amendment) Regulations, 2023
- Dated 24 Jul 2026Conduct of Business Regulations, 2005 — 9th Amendment, 2026
- Dated 19 Aug 2026Conduct of Business Regulations, 2005 — 10th Amendment, 2026
Commencement notices and reasons
Procedures and orders made under it
- Dated 22 Feb 2018Conduct of Business — Office Order
- Dated 4 Dec 2023Conduct of Business Regulations, 2005 — 7th Amendment, 2023 — Order
Proposed changes (drafts with no final yet)
- Dated 21 May 2024Conduct of Business Regulations, 2005 — 8th Amendment, 2024 — Draft
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.