CERC · Central Electricity Regulatory Commission
RE Tariff Regulations, 2009
Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009
RegulationDated 16 Sep 2009Published in the Gazette 17 Sep 2009F. No. L-7/186(201)/2009-CERC. dated 16th September, 2009
Replaced by Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2012
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software, from pages 1 to 68 of 88. Check the regulator's original before you rely on it.
This is the Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009 — the framework under which CERC sets generic and project-specific tariffs for renewable generating stations. It was notified on 16 September 2009 (p45) and published in the Gazette of India, Extraordinary, Part III Section 4, on 17 September 2009 (p1), and comes into force on gazette publication (p45).
The supplied extract opens with the Gazette cover and the schedules (pp1–44), which carry wind power density maps and state-wise resource tables. Only the wind power density map legend and its category table can be read (p44).
The operative text starts at p45: short title and commencement, then a long definitions clause covering technologies, financial terms and grid terms (pp45–49). Regulation 3 restricts application to RE stations whose tariff the Commission determines under s.62 read with s.79 (p49). Regulation 4 sets technology-by-technology eligibility criteria — including the minimum annual mean wind power density of 200 Watt/m² at 50 m hub height, small-hydro capacity not exceeding 25 MW, biomass fossil fuel limited to 15% of annual fuel consumption, the co-generation topping-cycle output test, and the hybrid solar thermal requirement that not less than 75% of electricity come from the solar component (pp50–51).
Chapter 1, General Principles (pp52–56), sets the three-year control period, tariff periods by technology, the categories eligible for project-specific tariff, petition and documentation requirements (forms 1.1, 1.2, 2.1, 2.2), the single-part tariff structure (two components where there is a fuel cost), levellised tariff design, and must-run treatment for all RE plants except larger biomass and co-generation.
Chapter 2, Financial Principles (pp57–62), lays down the common financial norms: capital cost scope, debt-equity, loan tenure and interest rate, depreciation, return on equity, working capital, O&M escalation, rebate, late payment surcharge, CDM benefit sharing, treatment of government subsidy and accelerated depreciation, and taxes as a pass-through.
Chapters 3 and 4 (pp63–68) give technology-specific parameters for wind and small hydro — capital cost and its indexation to WPI steel and electrical machinery, CUF norms, auxiliary consumption and O&M expenses. Chapters for the remaining technologies and the appended forms are outside it.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.