Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2012

Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012

RegulationDated 6 Feb 2012In force from 1 Apr 2012L-1/94/CERC/2011 dated 06.02.2012

Replaced by RE Tariff Regulations, 2017

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's principal notification setting the terms and conditions on which tariffs for renewable energy generating stations are determined (p1). It was issued on 6 February 2012 under section 61 read with section 178(2)(s) of the Electricity Act, 2003, comes into force on 1.4.2012, and states it will remain in force for five years unless reviewed earlier or extended (p1). The Control Period is five years with FY 2012-13 as its first year (p8).

Regulations 1–4 (p1–7) give definitions, state the scope — tariff for RE generating stations determined by the Commission under section 62 read with section 79 — and lay down technology-by-technology eligibility criteria based on new plant and machinery, including a cap on fossil fuel use in biomass projects and a qualifying test for non-fossil fuel cogeneration.

Chapter 1, General Principles (p8–13), fixes the Control Period and Tariff Period, provides for project-specific tariff on a case-to-case basis, sets the petition procedure and the tariff structure (single-part, or two-part where there is a fuel cost component), the levellised tariff design, and despatch principles, including 'must run' status for most RE plants.

Chapter 2, Financial Principles (p14–19), gives the common financial norms: capital cost, debt-equity ratio, loan tenure and interest rate, depreciation, return on equity, interest on working capital, O&M expenses and their escalation, rebate, late payment surcharge, sharing of CDM benefits, treatment of subsidy and incentives, and taxes and duties as a pass-through.

Chapters 3 to 10 are technology-specific parameter chapters, each specifying capital cost and its indexation mechanism, and then the operating and cost parameters relevant to that technology — wind (p20–22), small hydro (p23–25), biomass Rankine cycle (p26–32), non-fossil fuel cogeneration (p33–38), solar PV (p39), solar thermal (p40–41), biomass gasifier (p42–46) and biogas (p47–51). Parameters vary by technology and include capacity utilisation factor or plant load factor, auxiliary consumption, station heat rate or specific fuel consumption, calorific value, fuel price and its indexation, and O&M expenses.

Chapter 11, Miscellaneous (p52), allows tariff to be agreed between a generating company and a licensee in deviation from the norms so long as the levellised result does not exceed the levellised tariff under these Regulations, and gives the Commission power to relax any provision by general or special order.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Generation tariff

Read with this

Other copies of these documents (5)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document