CERC · Central Electricity Regulatory Commission
Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2012
Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012
RegulationDated 6 Feb 2012In force from 1 Apr 2012L-1/94/CERC/2011 dated 06.02.2012
Replaced by RE Tariff Regulations, 2017
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's principal notification setting the terms and conditions on which tariffs for renewable energy generating stations are determined (p1). It was issued on 6 February 2012 under section 61 read with section 178(2)(s) of the Electricity Act, 2003, comes into force on 1.4.2012, and states it will remain in force for five years unless reviewed earlier or extended (p1). The Control Period is five years with FY 2012-13 as its first year (p8).
Regulations 1–4 (p1–7) give definitions, state the scope — tariff for RE generating stations determined by the Commission under section 62 read with section 79 — and lay down technology-by-technology eligibility criteria based on new plant and machinery, including a cap on fossil fuel use in biomass projects and a qualifying test for non-fossil fuel cogeneration.
Chapter 1, General Principles (p8–13), fixes the Control Period and Tariff Period, provides for project-specific tariff on a case-to-case basis, sets the petition procedure and the tariff structure (single-part, or two-part where there is a fuel cost component), the levellised tariff design, and despatch principles, including 'must run' status for most RE plants.
Chapter 2, Financial Principles (p14–19), gives the common financial norms: capital cost, debt-equity ratio, loan tenure and interest rate, depreciation, return on equity, interest on working capital, O&M expenses and their escalation, rebate, late payment surcharge, sharing of CDM benefits, treatment of subsidy and incentives, and taxes and duties as a pass-through.
Chapters 3 to 10 are technology-specific parameter chapters, each specifying capital cost and its indexation mechanism, and then the operating and cost parameters relevant to that technology — wind (p20–22), small hydro (p23–25), biomass Rankine cycle (p26–32), non-fossil fuel cogeneration (p33–38), solar PV (p39), solar thermal (p40–41), biomass gasifier (p42–46) and biogas (p47–51). Parameters vary by technology and include capacity utilisation factor or plant load factor, auxiliary consumption, station heat rate or specific fuel consumption, calorific value, fuel price and its indexation, and O&M expenses.
Chapter 11, Miscellaneous (p52), allows tariff to be agreed between a generating company and a licensee in deviation from the norms so long as the levellised result does not exceed the levellised tariff under these Regulations, and gives the Commission power to relax any provision by general or special order.
Read with this
Amendments and corrections
- Dated 18 Mar 2014Terms and Conditions for Tariff determination from Renewable Energy Sources (First Amendment) Regulations, 2014
- Dated 5 Jan 2015Terms and Conditions for Tariff determination from Renewable Energy Sources (Second Amendment) Regulations, 2014
- Dated 10 Jul 2015Terms and Conditions for Tariff determination from Renewable Energy Sources (Third Amendment) Regulations, 2015
- Dated 7 Oct 2015RE Tariff Regulations, 2012 — Fourth Amendment, 2015
- Dated 30 Mar 2016Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fifth Amendment, 2016
Commencement notices and reasons
- Dated 6 Feb 2012RE Tariff Regulations, 2012 — Statement of Objects and Reasons
- Dated 18 Mar 2014RE Tariff Regulations, 2012 — First Amendment, 2014 — Statement of Reasons
- Dated 5 Jan 2015RE Tariff Determination (Second Amendment) Regulations, 2014 — Statement of Reasons
- Dated 10 Jul 2015RE Tariff Third Amendment Regulations, 2015 — Statement of Reasons
- Dated 7 Oct 2015RE Tariff Regulations, 2012 — Fourth Amendment, 2015 — Statement of Reasons
- Dated 30 Mar 2016RE Tariff Regulations, 2012 — Fifth Amendment, 2016 — Statement of Reasons
Other copies of these documents (5)
- Dated 6 Feb 2012RE Tariff Regulations, 2012
- Dated 5 Jan 2014Terms and Conditions for Tariff Determination from Renewable Energy Sources (Second Amendment) Regulations, 2014
- Dated 18 Mar 2014Terms and Conditions for Tariff determination from Renewable Energy Sources, 2012 — First Amendment Regulations, 2014
- Dated 7 Oct 2015Renewable Energy Sources Tariff Regulations, 2012 — Fourth Amendment, 2015
- Dated 30 Mar 2016Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fifth Amendment Regulations, 2016
Proposed changes (drafts with no final yet)
- Dated 3 Mar 2015Generic Levellised Generation Tariff for Renewable Energy Sources, FY 2015-16 under RE Tariff Regulations, 2012 — Draft
- Dated 3 Mar 2015File: Benchmark Capital Cost Norm for Solar PV and Solar Thermal Projects, FY 2015-16 — Suo-Motu Order — Draft
- Dated 3 Mar 2015Public notice: Generic Levellised Generation Tariff for Renewable Energy Sources, FY 2015-16 — Public Notice
Earlier drafts
- Dated 6 Dec 2013RE Tariff (First Amendment) Regulations, 2013 — Draft
- Dated 6 Dec 2013Public notice: Renewable Energy Sources Tariff (First Amendment) Regulations, 2013 — Draft
- Released with the notice dated 6 Dec 2013Explanatory memorandum: RE Tariff Regulations, 2012 — First Amendment, 2013 — Explanatory Memorandum
- Dated 25 Nov 2014Terms and Conditions for Tariff Determination from Renewable Energy Sources (Second Amendment) Regulations, 2014 — Draft
- Dated 25 Nov 2014Public notice: RE Tariff Determination (Second Amendment) Regulations, 2014 — Public Notice
- Released with the notice dated 25 Nov 2014Explanatory memorandum: RE Tariff (Second Amendment) Regulations, 2014 — Explanatory Memorandum — Draft
- Dated 16 Apr 2015Terms and Conditions for Tariff Determination from Renewable Energy Sources (Third Amendment) Regulations, 2015 — Draft
- Released with the notice dated 16 Apr 2015Explanatory memorandum: Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2014 — Third Amendment — Explanatory Memorandum — Draft
- Dated 16 Apr 2015Public notice: Draft RE Tariff Determination (Third Amendment) Regulations, 2015 — Public Notice
- Released with the notice dated 10 Aug 2015Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fourth Amendment, 2015 — MSW and RDF
- Released with the notice dated 10 Aug 2015Explanatory memorandum: MSW/Waste to Energy Generic Tariff Norms, 2015-16 — Explanatory Memorandum
- Dated 10 Aug 2015Public notice: Public Notice — Proposed Generic Tariff Norms for Municipal Solid Waste/Waste to Energy Projects and Indicative Tariff for 2015-16
- Dated 16 Mar 2016Renewable Energy Tariff Determination (Fifth Amendment) Regulations, 2016 — Draft
- Dated 16 Mar 2016Public notice: Renewable Energy Sources Tariff Regulations, 2012 — Fifth Amendment, 2016 — Public Notice — Draft
- Released with the notice dated 16 Mar 2016Explanatory memorandum: Renewable Energy Sources Tariff, 2012 — Fifth Amendment, 2016 — Explanatory Memorandum — Draft
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.