Renewable Purchase Obligation and REC Framework Implementation Regulations, 2011

Chhattisgarh State Electricity Regulatory Commission (Renewable Purchase Obligation and REC framework Implementation) Regulations, 2011

RegulationDated 4 Mar 2011No. 36/CSERC/2011 dated March 04, 2011

Replaced by Renewable Purchase Obligation and REC Framework Implementation Regulations, 2013

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CSERC's principal framework for renewable purchase obligation (RPO) and for plugging the State into the national Renewable Energy Certificate (REC) mechanism. Notified on 4 March 2011 (p1) under s.86(1)(e) read with s.181 of the Electricity Act, it extends to the whole State and takes effect from the Gazette notification date, which is not printed (p2).

Regulation 3 identifies who is obligated — distribution licensees, captive users and open access consumers above stated capacity/contract thresholds — and sets the operating period, running to the end of FY 2012-13 and continuing thereafter until the Commission revises it (p6–7). Regulation 4 and Table 1 fix the annual minimum purchase percentages split by source (solar, biomass, other non-solar), allow substitution between sources on stated terms, let already-contracted RE purchases count, and route non-compliance to s.142 of the Act (p7–9). Regulation 5 makes CERC-issued RECs the instrument for discharging the obligation, with solar and non-solar certificates treated separately and proof of purchase filed with the Commission (p9–10).

Regulation 6 establishes a State Agency for accreditation, data collection and quarterly compliance reporting to the Commission; Regulation 7 governs how licensees project and true-up RE purchase through tariff filings; Regulation 8 covers captive users and open access consumers, including a separate commencement by Gazette notification (p10–13). Regulation 9 gives the default consequences — a mandated separate fund sized on the shortfall and the forbearance price, possible Commission-directed purchase of RECs, and a narrow carry-forward relief (p13–14). Regulation 10 is unusual: where licensees miss the target, it spreads the shortfall across licensees in the State and provides an illustrative compensation/sharing example based on differential RE vs non-RE cost (p14–16).

The remainder deals with priority grid connectivity for RE (p16), RE pricing — a choice between the 2008 non-conventional tariff regulations and the REC route, with the electricity component priced at pooled cost excluding RE — cross-subsidy surcharge on open access and no banking for third-party RE sale (p16–19), powers to remove difficulties and to amend (p19), and repeal of the 2008 procurement regulations with savings for executed PPAs (p19).

Standard name
RPO Regulations, REC Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), Open access

Read with this

3 more documents belong here and are not on Voltaic: 2 copies in another language and 1 corrigendum not held as English text.

Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cserc.gov.in ↗

Report an issue with this document