UERC · Uttarakhand Electricity Regulatory Commission
Standards of Performance Regulations, 2022 — Statement of Objects and Reasons
Uttarakhand Electricity Regulatory Commission (Standards of Performance) Regulations, 2022
Statement of reasonsDated 8 Jun 2022
The commission's reasons for the Standards of Performance Regulations, 2022.
Summary
Summary written by software, from pages 1 to 29 of 80. Check the regulator's original before you rely on it.
This is the Statement of Objects and Reasons (SoR) issued by the Uttarakhand Electricity Regulatory Commission for its (Standards of Performance) Regulations, 2022 (p1–2). It records why the Commission decided to replace its 2007 SoP Regulations — technological and regulatory changes since 2007, and a shift of focus from access and affordability to quality and reliability of supply (p1). It sets out the consultation process: draft regulations issued on 08.06.2022, public notice on 10.06.2022, comments initially due by 11.07.2022 and extended to 26.07.2022, and a public hearing on 26.07.2022 (p2). It states that the 2022 Regulations apply to all distribution and retail supply licensees, including deemed licensees, and all consumers in Uttarakhand, and will come into force on Gazette publication, replacing the 2007 Regulations; the Gazette date is not printed (p2–3).
Paragraph by paragraph, the SoR quotes the draft text, stakeholders' comments (mainly from UPCL and CER-IITK) and the Commission's response. It consolidates interpretation into Regulation 1, deletes separate interpretation and 'other statutes' regulations, and renumbers the remainder (p3–4). It settles definitions of licensee and Electrical Inspector (p4–5), the objective of maintaining distribution-system and supply parameters, and the distinction between Guaranteed Standards in Schedule-I (with compensation) and Overall Standards in Schedule-II (p6–7). A large part of the supplied text deals with compensation: claims on Format SoP-2, automatic compensation for services proposed by the licensee and approved by the Commission, adjustment in current and future bills, determination within 30 days, payment within 60 days, refusal orders within 45 days, and escalation to the CGRF (p9–18). It requires updated Complaint Handling Procedures within three months of notification, an online claim facility and report-generation framework within nine months, publicity and website disclosure, and periodic SoP reports in Formats SoP-3 to SoP-10 (p8–23). Force-majeure exemptions are listed, with avalanches added (p23–24). The last pages address Schedule-I guaranteed standards for new connections, load changes and restoration of power supply, with separate timelines for urban, rural and hilly areas not connected by motorable roads (p24–29).
Read with this
The regulation
- Dated 22 Sep 2022Standards of Performance Regulations, 2022
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.