UERC · Uttarakhand Electricity Regulatory Commission
Standards of Performance Regulations, 2022
Uttarakhand Electricity Regulatory Commission (Standards of Performance) Regulations, 2022
RegulationDated 22 Sep 2022No. F-9(33)/RG/UERC/2022/771 dated September 22, 2022
Summary
Summary written by software, from pages 1 to 30 of 46. Check the regulator's original before you rely on it.
The notification (p1) issues the UERC (Standards of Performance) Regulations, 2022 under the Electricity Act 2003. They apply to all distribution and retail supply licensees, including deemed licensees, and their consumers in Uttarakhand. They come into force on Gazette publication and replace the 2007 SoP Regulations; the Gazette date is not printed. Regulations 1–13 (pp1–13) set definitions, objectives, and the framework. Regulation 4 creates two tiers: Guaranteed Standards in Schedule I and Overall Standards in Schedule II, both amendable by Commission order.
Regulations 5–7 (pp6–11) require the licensee to update its Complaint Handling Procedure within a prescribed period for Commission approval, prescribe complaint recording and compensation claim formats, and set the compensation mechanism. Compensation for failure of a Guaranteed Standard is generally credited in the electricity bill, with separate provisions for shifting works, stay orders, arrears, and refusal orders. These regulations also set timelines for claim filing, determination, payment, and escalation to CGRF and Ombudsman. Regulation 7 (pp9–10) requires periodic divisional/circle-wise reports on guaranteed and overall standards and compensation, with formats SoP-3 to SoP-10. Regulation 8 (p11) requires publicity and website disclosure; Regulation 9 says no fees; Regulation 10 suspends standards in force majeure and exempts certain events; Regulations 11–13 preserve powers to remove difficulties, amend and relax.
Schedule I (pp14–19) lists Guaranteed Standards for new connections, load changes, restoration of supply, voltage quality, meter complaints, transfer/conversion, billing, disconnection/reconnection, and shifting of lines/poles/transformers, differentiating urban, rural and hilly areas. Schedule II (pp20–23) sets Overall Standards for fuse-off calls, line breakdowns, transformer failures, scheduled outages, reliability indices SAIFI/SAIDI/MAIFI, voltage unbalance, billing mistakes, faulty meters and NA/NR billing, with formulas and reporting. Schedule III (pp24–30) links each Guaranteed Standard to compensation payable per day or hour of default, with separate rates for single versus multiple affected consumers and caps. The text references formats SoP-1 to SoP-10, but they are not in the supplied excerpt.
Read with this
Commencement notices and reasons
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of UERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.