Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Capital Expenditure Guidelines for Distribution Licensees, Madhya Pradesh, 2025

Guidelines for Capital Expenditure by Distribution Licensees in Madhya Pradesh, 2025

OrderDated 2 Jan 2025

Made under the Capital Expenditure Guidelines for Distribution Licensees in Madhya Pradesh, 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is MPERC's one-page order dated 02/01/2025 issuing the revised "Guidelines for Capital Expenditure by Distribution Licensees in Madhya Pradesh, 2025" (p1). The revision replaces the 2005 capital-expenditure guidelines that the Commission had specified under Regulation 10.3 of the MPERC (Conditions of Distribution License for Distribution Licensees (including Deemed Licensees)), 2004, as amended (p1). A draft was shared with the DISCOMs by letter dated 19/11/2024, and their comments were examined before the guidelines were finalised (p1). Distribution licensees are directed to comply with the revised guidelines with immediate effect (p1). Transmission licensees are expressly carved out: the 2005 guidelines continue to apply to them until separate transmission capex guidelines are made (p1). Only the order page is present in this text — the operative guideline provisions are not reproduced, so the substantive capex rules cannot be read from this document.

Primary topics
Capital cost and investment

Read with this

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document