Capital Expenditure Guidelines for Distribution Licensees in Madhya Pradesh, 2025

Guidelines for Capital Expenditure by Distribution Licensees in Madhya Pradesh, 2025

GuidelinesDated 2 Jan 2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

These are MPERC's 2025 Guidelines for Capital Expenditure by Distribution Licensees in Madhya Pradesh. They revise the 2005 guidelines and set the framework for distribution licensees to obtain the Commission's in-principle approval for proposed capital investments (p1).

Section 1 lists broad categories of capital investment schemes, including grant-funded schemes, new connections, system strengthening, agricultural connections, new substations/lines/transformers, quality and reliability works, SCADA and control/communication equipment, metering and protection, consumer services, asset replacement, DSM/renewable integration/energy conservation, smart grid, reactive power, civil works, storage, EV charging stations, microgrids, pilot emerging technologies, and any other schemes (pp1–2). It also requires a scheme-wise Detailed Project Report and lists evaluation parameters such as cost, time, IRR/payback, loss reduction, voltage profile, SAIFI/SAIDI, power quality, billing and collection efficiency, ARR impact, equipment failure rates, reactive power flow, automation/OPEX, online monitoring and consumer benefit (pp2–3).

Section 2 sets the approval framework. Schemes exceeding Rs 10 Crore require Commission approval; schemes of Rs 10 Crore or below require approval under the licensee's Delegation of Powers. Approval is two-stage: in-principle before works and final cost approval after the asset is put to use. Prior in-principle approval is not required for 100% grant-funded schemes or emergency works, but final approval still applies (pp3–4).

Section 3 lists what an in-principle petition must contain: scheme overview, justification, technical and financial analysis, cost-benefit analysis, monitoring methodology, statutory clearances, constraints and mitigation. The format is in Appendix 1/Annexure 1, which the Commission may modify or supplement by asking for more information. Section 4 provides for prudence check against Annexure 3 (pp4–6). Section 5 requires an annual rolling five-year capital investment plan by 1st October, comparing in-principle approved, revised, ongoing and new scheme costs, and including N-1 completed schemes for final cost approval. The Commission may return incomplete plans (pp6–7).

Repeal and saving: the 2005 guidelines are repealed for distribution licensees from the date of notification; they continue for transmission licensees until separate transmission guidelines are made; past actions under the repealed distribution guidelines are deemed valid (p7). Annexures 1–4 give filing formats and checklists for in-principle approval, rolling plans, technical and financial evaluation, and completed works, including justification for variations above 10% of approved cost and for time/cost overruns (pp8–14).

Standard name
Capital Investment Approval
Primary topics
Capital cost and investment, Network planning and investment

Read with this

Procedures and orders made under it

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.