UPERC · Uttar Pradesh Electricity Regulatory Commission
Rooftop Solar PV Grid Interactive System Gross/Net Metering Regulation, 2019 — Second Amendment, 2023
UPERC (Rooftop Solar PV Grid Interactive System Gross/ Net Metering) Regulation, 2019 (Second Amendment)
AmendmentDated 17 Nov 2023No. UPERC/Secretary/RSPV Regulations/002 dated November 17, 2023
Amends a regulation not yet published on Voltaic.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Second Amendment to the Uttar Pradesh Electricity Regulatory Commission's 2019 Rooftop Solar PV Grid Interactive System Gross/Net Metering Regulation. The Commission states it is acting because the Government of Uttar Pradesh has framed the UP Solar Policy 2022, which is to remain in operation for five years or until a new policy is notified (p3).
Clause 1 names the instrument the RSPV Regulation, 2019 (Second Amendment) and says it comes into force from the date of notification in the State Official Gazette; no Gazette date is printed (p3).
Clause 2 sets out the amendments in a two-column existing-versus-amended table. The visible changes expand the net metering scheme's consumer coverage — bringing in categories such as LMV-5, domestic consumers of the listed discoms, and specified public and educational institutions under LMV-4A — and rewrite the definition of 'Net Metering' so the arrangement applies to a consumer's premises as described in clause 2(k)(iii) and covers delivery of surplus electricity to the Distribution Licensee after offsetting electricity supplied (p3–4). The document closes with the Secretary's order line and print-run details (p4).
Read with this
The regulation itself is not yet published on Voltaic.
Amendments and corrections
One more document belongs here and is not on Voltaic: a main regulation not held as English text.
Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.