UPERC · Uttar Pradesh Electricity Regulatory Commission
Rooftop Solar PV Grid Interactive System Gross/Net Metering Regulation, 2019 — First Amendment/Addendum, 2022
UPERC (Rooftop Solar PV Grid Interactive System Gross/ Net Metering) Regulation, 2019 (First Amendment / Addendum)
AmendmentDated 1 Jun 2022U.P.E.R.C./Secretary/RSPV Regulations/118 dated June 01, 2022
Amends a regulation not yet published on Voltaic.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Uttar Pradesh Electricity Regulatory Commission issued this First Amendment/Addendum to its 2019 Rooftop Solar PV Gross/Net Metering Regulations by notification dated 1 June 2022 (p1, p9), following the Ministry of Power's notification G.S.R.(E) 448(E) of 28 June 2021, which introduced 'net billing or net feed-in' as a third settlement option alongside gross and net metering (p9). The amendment comes into force from the date of its notification in the State Gazette (p9); the Gazette date itself is not printed.
Pages 9–12 carry the amendment table. It redrafts the definition of 'eligible consumer' and the metering-scheme categories so as to bring in agricultural (LMV-5) and LMV-1 consumers, deletes Regulation 4.3, and adjusts Regulations 4.2, 10, 12.2 and 14, including how self-consumed and exported energy qualify towards the Renewable Purchase Obligation.
Pages 13–14 hold the addendum: new definitions of 'net billing / net feed-in' and its tariff (same as the gross metering tariff, as decided by the Commission), a new Regulation 10.4(A) setting out the billing-period energy accounting and settlement procedure, a new Regulation 10.6 directing UPNEDA / the state designated agency to finalise approval procedures and timelines within 60 days for the Commission's approval, and a new Regulation 18 conferring power to remove difficulties.
Pages 14–16 reproduce Annexure-III(C), a model inter-connection agreement for the net billing / net feed-in arrangement, covering eligibility, technical and interconnection requirements, clearances, access and disconnection, liabilities, commercial settlement, connection costs and termination.
Read with this
The regulation itself is not yet published on Voltaic.
Amendments and corrections
One more document belongs here and is not on Voltaic: a main regulation not held as English text.
Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.