KERC · Karnataka Electricity Regulatory Commission
Generation Tariff Regulations, 2019
Karnataka Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2019
RegulationDated 29 Jul 2021Published in the Gazette 1 Sep 2021In force from 1 Apr 2019No: KERC/S/F-34/Vol-12(a)/509 dated 29.07.2021
Replaced by Generation Tariff Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software, from pages 1 to 30 of 213. Check the regulator's original before you rely on it.
This is KERC's notification and order dated 29 July 2021 approving the Karnataka Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2019, annexed as Appendix-I and given effect from 1 April 2019 through 31 March 2024 (pp1-4). The opening pages explain the statutory basis under the Electricity Act 2003, the consultative process, the Covid-19 delay, and the decision that matters not covered by these regulations will be governed by the CERC Tariff Regulations 2019 (pp1-4).
Chapter 1 (pp4-15) sets the short title, Karnataka-wide extent, the 2019-24 control period, scope and exclusions — renewable stations under the 2004 regulations and tariff-based competitive-bidding projects — and a long definition list covering COD, beneficiary, change in law, integrated mine, input price, PAF, PLF, useful life and others. Chapter 2 (p16) deals with determining COD under the Grid Code, mismatch liability between generation and transmission, and treatment of infirm power as deviation settled through the state DSM fund.
Chapter 3 (pp17-22) lays out the tariff-determination procedure: consolidated filings for existing and new units, publication of applications in newspapers and on websites, Commission processing, in-principle approval for large additional capitalization, and truing-up of 2014-19 and 2019-24, including interim truing-up. Chapter 4 (pp22-24) sets the tariff structure: capacity charge and energy charge for thermal stations, separate supplementary charges for revised emission standards, annual fixed cost components, energy charge components, and special arrangements for thermal stations older than 25 years.
Chapters 5-6 (pp24-30) set the debt-equity norm and the computation of capital cost: what is included or excluded for new and existing projects, prudence-check principles, IDC/IEDC, controllable and uncontrollable factors, and initial-spares ceilings. Chapter 7 begins at p30 with additional capitalization within the original scope up to and after the cut-off date.
Read with this
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.