Skip to content

KERC · Karnataka Electricity Regulatory Commission

Generation Tariff Regulations, 2024

Karnataka Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2024

RegulationDated 9 Sep 2024In force from 1 Apr 2024KERC/S/2024/652 dated 09.09.2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software, from pages 1 to 39 of 141. Check the regulator's original before you rely on it.

This is KERC's principal generation tariff regulation for the 2024-29 control period, issued as a notification dated 9 September 2024 and annexed to the Commission's order (p1-p4). It applies to generating stations and units in Karnataka whose tariff the Commission determines under section 62, where commercial operation falls between 1 April 2024 and 31 March 2029; it excludes renewable stations covered by the separate renewable procurement regulations and projects whose tariff is discovered by competitive bidding adopted under section 63 (p4-p5). The regulations commence retrospectively on 1 April 2024 and run to 31 March 2029 unless reviewed or extended (p4). Anything not covered is to be governed by CERC's 2024 Tariff Regulations (p3).

Chapter 1 (p4-p20) contains the short title, extent to Karnataka, application and exclusions, and a long definitions section. It defines control-period concepts, integrated mines, emission control systems, change in law, force majeure, capital cost, COD, beneficiaries, useful life and key operating parameters (p5-p19); it also gives interpretation rules for day, quarter, year and units (p19-p20). Chapter 2 (p20-p22) deals with date of commercial operation for generating stations and integrated mines, sale of infirm power, and supply of coal or lignite before an integrated mine's COD. Chapter 3 (p22-p32) sets the procedure for tariff determination: who files, when, consolidated petitions, supplementary tariff for emission control, interim tariff, publication of petitions in English and Kannada newspapers and on the website, in-principle approval for change-in-law/force-majeure capex, and truing up of 2019-24 and 2024-29.

Chapter 4 (p32-p34) sets the tariff structure: two-part capacity and energy charges for thermal stations, separate supplementary capacity/energy charges for emission control, hydro charges, the annual fixed cost components, and a special arrangement for thermal stations that have completed 25 years where beneficiaries may agree to recover capacity charges on scheduled generation. Chapter 5 (p34-p36) sets the debt-equity framework and its treatment for new and existing projects, additional capex, renovation and modernization and emission control. Chapter 6 (p36-p39) begins the computation of capital cost: inclusions for new projects, existing projects, hydro projects and projects acquired through NCLT under the IBC.

Standard name
Generation Tariff Regulations
Primary topics
Generation tariff, Multi Year Tariff (MYT), Tariff determination

Read with this

Other copies of these documents (1)

Earlier drafts

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document