KERC · Karnataka Electricity Regulatory Commission
Generation Tariff Regulations, 2024
Karnataka Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2024
RegulationDated 9 Sep 2024In force from 1 Apr 2024KERC/S/2024/652 dated 09.09.2024
Summary
Summary written by software, from pages 1 to 39 of 141. Check the regulator's original before you rely on it.
This is KERC's principal generation tariff regulation for the 2024-29 control period, issued as a notification dated 9 September 2024 and annexed to the Commission's order (p1-p4). It applies to generating stations and units in Karnataka whose tariff the Commission determines under section 62, where commercial operation falls between 1 April 2024 and 31 March 2029; it excludes renewable stations covered by the separate renewable procurement regulations and projects whose tariff is discovered by competitive bidding adopted under section 63 (p4-p5). The regulations commence retrospectively on 1 April 2024 and run to 31 March 2029 unless reviewed or extended (p4). Anything not covered is to be governed by CERC's 2024 Tariff Regulations (p3).
Chapter 1 (p4-p20) contains the short title, extent to Karnataka, application and exclusions, and a long definitions section. It defines control-period concepts, integrated mines, emission control systems, change in law, force majeure, capital cost, COD, beneficiaries, useful life and key operating parameters (p5-p19); it also gives interpretation rules for day, quarter, year and units (p19-p20). Chapter 2 (p20-p22) deals with date of commercial operation for generating stations and integrated mines, sale of infirm power, and supply of coal or lignite before an integrated mine's COD. Chapter 3 (p22-p32) sets the procedure for tariff determination: who files, when, consolidated petitions, supplementary tariff for emission control, interim tariff, publication of petitions in English and Kannada newspapers and on the website, in-principle approval for change-in-law/force-majeure capex, and truing up of 2019-24 and 2024-29.
Chapter 4 (p32-p34) sets the tariff structure: two-part capacity and energy charges for thermal stations, separate supplementary capacity/energy charges for emission control, hydro charges, the annual fixed cost components, and a special arrangement for thermal stations that have completed 25 years where beneficiaries may agree to recover capacity charges on scheduled generation. Chapter 5 (p34-p36) sets the debt-equity framework and its treatment for new and existing projects, additional capex, renovation and modernization and emission control. Chapter 6 (p36-p39) begins the computation of capital cost: inclusions for new projects, existing projects, hydro projects and projects acquired through NCLT under the IBC.
Read with this
Other copies of these documents (1)
- Dated 9 Sep 2024Generation Tariff Regulations, 2024
Earlier drafts
- Dated 19 Apr 2024Generation Tariff Regulations, 2024 — Draft
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.