MSERC · Meghalaya State Electricity Regulatory Commission
Grid Interactive Distributed Renewable Energy Sources (2 of 2026) Regulations, 2026 — First Amendment, 2026
Meghalaya State Electricity Regulatory Commission (Grid Interactive Distributed Renewable Energy Sources) (2 of 2026) (First Amendment) Regulations, 2026
AmendmentDated 26 Oct 2026MSERC/DRE-REGULATION/2026/261 dated 26th October 2026
Amends a regulation not yet published on Voltaic.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-clause amendment by the Meghalaya State Electricity Regulatory Commission to its Grid Interactive Distributed Renewable Energy Sources Regulations, 2026 (the "Principal Regulations", notified 30 April 2026). The Commission pre-published the draft, issued a public notice on 1 October 2026 with comments due 14 October 2026, received written comments from MePDCL and the North Eastern Indira Gandhi Institute of Health & Medical Sciences, Shillong, and notified the amendment without modification on 26 October 2026 (p1).
The operative part rewrites sub-clause 4.1.2 of Regulation 4.1 (Net Metering), which sits in Chapter 4 on metering mechanisms, eligible consumers and allowed DRES capacities. The rewritten sub-clause fixes the floor and ceiling for net-metered DRES capacity — a minimum of 1 kW and a maximum of the lower of the prosumer's sanctioned load or contract demand, or 500 kW — and adds a storage condition: plants of more than 10 kW must use a hybrid inverter with battery storage sized at no less than 20% of the plant's daily energy generation potential (p2–3).
The substantive addition is a grandfathering proviso. A prosumer who already held DISCOM approval under the earlier rooftop-solar net-metering regulations, before the Principal Regulations were notified, for a capacity beyond 500 kW keeps the approved capacity, with or without battery storage. The capacity table at Regulation 4.7 is to be read subject to that proviso (p3).
Commencement is from the date of publication in the Meghalaya Official Gazette, which is not printed in the text (p2). The regulations apply to DRES installed in the distribution licensee's area of supply (p1).
Read with this
The regulation itself is not yet published on Voltaic.
Earlier drafts
- Dated 11 Mar 2026Grid Interactive Distributed Renewable Energy Sources Regulations, 2026 — Comment Deadline Extension Notice
- Dated 1 Oct 2026Grid Interactive Distributed Renewable Energy Sources (First Amendment) Regulations, 2026 — Draft
- Dated 1 Oct 2026Public notice: Grid Interactive Distributed Renewable Energy Sources, 2026 — First Amendment — Public Notice — Draft
3 more documents belong here and are not on Voltaic: 1 draft or notice on a draft not held as English text, 1 main regulation and 1 procedure or order made under it not held as English text.
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.