Grid Interactive Distributed Renewable Energy Sources (First Amendment) Regulations, 2026 — Draft
Meghalaya State Electricity Regulatory Commission (Grid Interactive Distributed Renewable Energy Sources) (2 of 2026) (First Amendment) Regulations, 2026
Draft amendmentDated 1 Oct 2026MSERC/DRE-REGULATION/2026/... dated 1st October 2026
Draft
A proposal that has since been finalised as the Grid Interactive Distributed Renewable Energy Sources (2 of 2026) Regulations, 2026 — First Amendment, 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
Pre-publication notification of a draft amendment issued by the Meghalaya State Electricity Regulatory Commission (p1). The Commission proposes to amend the MSERC (Grid Interactive Distributed Renewable Energy Sources) (2 of 2026) Regulations, 2026 — the "Principal Regulations" — under ss.61, 66, 86(1)(e) and 181 of the Electricity Act 2003 read with Regulations 15.2 and 15.3 of the Principal Regulations (p1).
Clause 1 gives the short title and ties commencement to publication in the Official Gazette of the Government of Meghalaya (p1). Clause 2 substitutes sub-clause 4.1.2 of Regulation 4.1 (Chapter 4 — Metering Mechanisms, Eligible Consumers and Allowed DRES Capacities), the provision that governs net metering. The substituted text sets a minimum eligible DRES capacity of 1 kW and caps capacity at the lower of the prosumer's sanctioned load or contract demand and 500 kW (p1).
Two provisos follow. The first requires DRES of 10 kW and above to be equipped with a hybrid inverter and battery energy storage sized to at least 20% of the plant's daily energy generation potential (p1–2). The second grandfathers prosumers who received DISCOM approval for capacity beyond 500 kW under the 2015 rooftop-solar net-metering regulations before the Principal Regulations were notified: the approved capacity stands, with or without battery storage, and the Table at Regulation 4.7 is to be read with that proviso (p2). The notification is signed by the Secretary for the Commission (p2).
Read with this
The regulation itself is not yet published on Voltaic.
Amendments and corrections
Earlier drafts
3 more documents belong here and are not on Voltaic: 1 draft or notice on a draft not held as English text, 1 main regulation and 1 procedure or order made under it not held as English text.
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.