Skip to content

OERC · Odisha Electricity Regulatory Commission

Wheeling Tariff and Retail Supply Tariff Regulations, 2014

Odisha Electricity Regulatory Commission (Terms and Conditions for Determination of Wheeling Tariff and Retail Supply Tariff) Regulations, 2014

RegulationDated 14 Nov 2014Published in the Gazette 20 Dec 2014No. 1539—OERC/RA/AMEND. REGU.-8/2013-Vol.-II dated The 14th November, 2014

Replaced by Wheeling Tariff and Retail Supply Tariff Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the OERC's principal tariff regulation for Odisha's distribution utilities. It sets out how the Commission will approve each distribution licensee's Aggregate Revenue Requirement and determine the two tariffs that flow from it — the Wheeling Tariff and the Retail Supply Tariff — for the first multi-year control period running 1 April 2014 to 31 March 2019 (p1–2).

Regulations 1 to 3 fix the title, extension to the whole of Odisha, the guiding principles of sections 61 and 62, commencement on gazette publication, and supersession of the 2004 tariff regulations (p1). Scope is defined by business rather than by consumer: the Commission determines ARR and tariff separately for the Wheeling Business (accounts segregated from retail supply) and the Retail Supply Business, and may fix only a ceiling tariff where two or more licensees compete in the same area, with open access charges routed through the separate Open Access Charges Regulation (p4–5).

Regulation 4 sets the general approach — a multi-year framework built on an approved Business Plan and performance trajectories, mandatory segregation of wheeling and retail supply accounts, baseline-setting, and a table classifying each ARR line item as controllable or uncontrollable (p5–6). Regulation 5 specifies what the long-term Business Plan must contain: category-wise demand forecasts, loss-reduction and collection-efficiency trajectories, power procurement plan, capital investment plan, O&M forecasts and depreciation (p6–8).

Regulation 6 governs the filing process — the annual ARR schedule, the contents of wheeling and retail supply tariff filings, treatment of gaps, and adoption of competitively bid power purchase (p8–9). Regulation 7 is the operative core (p9–23): ARR line items for each business; power purchase planning and its evaluation by GRIDCO; distribution loss estimation and the sharing of loss-reduction gains; O&M, employee, A&G and R&M cost heads; capital investment approval; financing norms (debt-equity, interest on loans and working capital); return on equity; bad-debt provision; depreciation; non-tariff income; income from other business; income tax; trading of surplus power; profit sharing; quality of supply; and 'other tariff principles' covering peak/off-peak and power-factor tariffs, surcharge, wheeling charges, additional surcharge, cross-subsidy, bulk supply price and state subsidy (p21–23).

Regulation 8 sets the annual truing-up procedure and the creation of regulatory assets (p23); Regulation 9 reserves to the Commission powers to issue practice directions, remove difficulties, relax, amend, interpret and depart from its own procedure (p23–24).

Standard name
Multi Year Tariff Regulations
Primary topics
Wheeling and retail supply tariff, Multi Year Tariff (MYT), Tariff determination

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗

Report an issue with this document