CERC · Central Electricity Regulatory Commission
RLDC Fees and Charges Regulations, 2014 — Explanatory Memorandum — Draft
Explanatory Memorandum
Explanatory memorandum to a draftReleased with the notice dated 1 Aug 2014
Draft
Voltaic holds no final regulation made from this draft.
Explanatory memorandum to the Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2014 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's explanatory memorandum for the draft (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2014, issued alongside that draft. Section 1 (p1) sets the background: the Commission's power under s.178(2)(h) read with s.28(4) of the Electricity Act, 2003 to specify levy and collection of fees and charges by RLDCs from generating companies and licensees; the earlier RLDC Regulations, 2009 and the fees determined under them for 2009-14; and the fact that the 2009-14 control period ended on 31.3.2014, the draft being framed for 1.4.2014 to 31.3.2019.
Section 2 (p2-16) walks through the salient features of the draft, one subsection per subject: new and modified definitions (p2-3); registration of users linked to 'grid access', with traders to be registered (p3); approval of rolling five-year CAPEX and REPEX plans on a life-cycle approach (p3-5); the basis for admitting capital cost, the debt-equity ratio and the LDC development fund (p5); the apportionment of annual charges between system operation and market operation and the basis for recovering each (p6-7, p12); return on equity, interest on loan, depreciation, and O&M and human resource expenses (p7-10); interest on working capital and apportionment of NLDC and corporate office expenses (p10-11); registration fees (p11-12); and key performance indicators and certification-linked incentives for system operators (p12-16). An abbreviations table closes the document (p17).
It is an explanatory document only: it argues the rationale for each proposed change and does not itself impose obligations. The binding provisions sit in the draft regulations, which are not reproduced here.
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 1 Aug 2014Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2014 — Draft
- Dated 1 Aug 2014Public notice: Draft RLDC Fees and Charges Regulations, 2014 — Public Notice
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.