CERC · Central Electricity Regulatory Commission
Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2014 — Draft
Central Electricity Regulatory Commission (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2014
Draft regulationDated 1 Aug 2014No. L-1/153/2014/CERC/ dated 1st August, 2014
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is a draft CERC notification dated 1 August 2014 (p1) that would issue the Central Electricity Regulatory Commission (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2014. It applies from Gazette publication (date not printed) and is tied to the 1.4.2014–31.3.2019 control period (p1). It governs how NLDC/RLDCs recover fees and annual charges from grid users and how the Power System Operation Company plans, files, trues up and incentivises costs.
Chapters 1–2 (p1–12) define the actors and scope: the regulations apply to fees and charges collected by RLDCs from generating companies, distribution licensees, inter-State transmission licensees, buyers, sellers and inter-State trading licensees (p2). They set registration requirements for grid access and scheduling, including a 30-day advance application and deemed registration under the 2009 regulations (p9–10), and require RLDC/NLDC CAPEX and REPEX plans for the control period, approved by the PSOC board (p11–12).
Chapters 3–5 (p13–32) set the application and ratemaking machinery. RLDC/NLDC file tariff forms within 180 days of notification (p13), serve users, publish newspaper notices (p13–14) and continue provisional billing based on previous approved charges until new ones are approved (p15). The Commission determines fees and charges separately for each RLDC/NLDC, apportions NLDC and corporate office costs by region (p15, p31–32), trues up capital expenditure and annual charges (p16–17), and computes capital cost, additional capitalisation/de-capitalisation, debt-equity ratio and the LDC Development Fund (p17–22). Annual charges are split into system and market operation components (p23) and built from return on equity, loan interest, depreciation, O&M, HR, NLDC/corporate costs and working capital interest (p23–31). Allocation formulas for system operation charges across transmission licensees, generators/sellers and distribution licensees/buyers, and for market operation charges, appear in Chapter 6 (p24, p34–37).
Chapter 6 (p33–37) also fixes registration fees by user category and capacity, with power exchanges paying a separate one-time fee (p33–34), and allows SLDCs to collect distribution licensees' charges by consensus (p36–37). Chapter 7 (p38–39) ties RLDC incentives to KPIs in Appendix V, with weightings across system, market and ancillary/support functions and certification-linked incentives. Chapter 8 (p40–41) covers monthly billing, late payment surcharge, FERV/hedging recovery, rebate, power to relax and removal of difficulty.
Appendices (p42–119) supply the tariff filing forms (Appendix I), the public notice format (Appendix II), the depreciation schedule (Appendix III), the registration application format (Appendix IV), and KPI reporting and computation formats (Appendices V–VI).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Released with the notice dated 1 Aug 2014Explanatory memorandum: RLDC Fees and Charges Regulations, 2014 — Explanatory Memorandum — Draft
- Dated 1 Aug 2014Public notice: Draft RLDC Fees and Charges Regulations, 2014 — Public Notice
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.