Electricity Supply Code and Related Matters, 2012 — Fourth Amendment — Draft
Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) (Fourth Amendment) Regulations, 2012
Draft amendmentDated 5 May 2012No. GERC/TECH-II/____/2012 dated 05.05.2012
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft amendment issued by the Gujarat Electricity Regulatory Commission on 5 May 2012, proposing the Fourth Amendment to its Electricity Supply Code and Related Matters Regulations, Notification No. 11 of 2005 (p1). It is deliberately short — three clauses — and its stated purpose is to rewrite the voltage-classification provision of the Supply Code and the assessment paragraph in one annexure.
Clause 1 gives the title and commencement: the regulations take effect on the date of publication in the Gazette (p1). Clause 2 substitutes Section 3.1.2 in full, restating the rated AC supply voltage that applies to installations by connected load and contracted demand, from 230 V single-phase up to 66 kV and above. It also lets a consumer opt for a higher voltage profile than the load would require, directs the licensee to make commercially viable offers to existing lower-voltage consumers who cross a threshold because of added load, and preserves continued supply at the lower voltage for existing consumers unless their requirement increases (p1–3).
Clause 3 rewrites the closing paragraph of the Load Factor and Diversity Factor table in Annexure B. It confines the ABCD assessment formula to cases where consumption is not duly metered, restricts proportionate-unit assessment to unauthorized use or resale of energy, and requires amounts already paid for those units to be subtracted (p3).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.