GERC · Gujarat Electricity Regulatory Commission
Electricity Supply Code and Related Matters, 2005 — Third Amendment, 2010 — Draft
Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) (Third Amendment) Regulations, 2010
Draft amendmentDated 31 Oct 2010No. GERC/TECH-1/
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A one-page draft notification by the Gujarat Electricity Regulatory Commission proposing the Third Amendment to the Electricity Supply Code and Related Matters Regulations No. 11 of 2005 (the Principal Regulations) (p1). It is made under Section 181(2)(x) read with Section 50 of the Electricity Act, 2003 (p1).
The operative content is a single substitution: clause 4.1.11 of the Principal Regulations is to be replaced so that a distribution licensee need not entertain an application for a new connection, reconnection, addition or reduction of load, change of name or shifting of a service line unless dues relating to that premises, or the applicant's dues on any other service connection held in his name anywhere in the licensee's jurisdiction, have been cleared (p1).
The regulations are to take effect on publication in the Gujarat Government Gazette; no Gazette date is stated, and the notification itself is undated and marked as a draft, signed by the Secretary (p1).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.