Skip to content

GERC · Gujarat Electricity Regulatory Commission

Electricity Supply Code and Related Matters, 2005 — Third Amendment, 2010 — Draft

Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) (Third Amendment) Regulations, 2010

Draft amendmentDated 31 Oct 2010No. GERC/TECH-1/

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page draft notification by the Gujarat Electricity Regulatory Commission proposing the Third Amendment to the Electricity Supply Code and Related Matters Regulations No. 11 of 2005 (the Principal Regulations) (p1). It is made under Section 181(2)(x) read with Section 50 of the Electricity Act, 2003 (p1).

The operative content is a single substitution: clause 4.1.11 of the Principal Regulations is to be replaced so that a distribution licensee need not entertain an application for a new connection, reconnection, addition or reduction of load, change of name or shifting of a service line unless dues relating to that premises, or the applicant's dues on any other service connection held in his name anywhere in the licensee's jurisdiction, have been cleared (p1).

The regulations are to take effect on publication in the Gujarat Government Gazette; no Gazette date is stated, and the notification itself is undated and marked as a draft, signed by the Secretary (p1).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes

Read with this

Voltaic holds no final regulation made from this draft.

Proposed changes (drafts with no final yet)

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document